Loading…
Loading…
2,800 results • Best match
SPL REPAIR/ REPLACEMENT OF CEILING FANS AND PROVN OF GEYSERS, WATER COOLER, DESERT COOLER, AC, SECURITY LIGHT, WALL FAN AND OTHER SANCTIONED WORKS UNDER AGE E/M AT NAMS (4th Call)
Excavation in trenches in soft/loose soil n.exc. 1.5mtr wide and n. exc. 1.5mtr in depth and getting out for laying of cables complete all as specified and directed.
Electrification of ARP DCS building and associated works
Erection of (wall mounting) network rack for LAN, in sheet steel enclosure.This work includes transporting the rack from Central stores/EDP to site, erection of rack at wall (surface mounting) of ARP electrical room. Commissioning assistance is required from contractor for assembling optical media convertor, 24 port switch, laying of cables inside the rack etc. Minor civil work required shall be done for mounting of rack as per scope of work. The rack and functional components shall be supplied by KMML. All other materials including anchor bolts/screws etc. for erection are in the scope of the contractor.
Work of Supply and replacement of various types of damaged A and B Panel installed under the area of Executive Engineer SCADA, Vikas Nagar KESCo. Kanpur
Digging of trench by Making pits after due survey with the help of utility detector of existing electrical/telephonic cable/and other utilites of public utilites department and laying of cables of size 3.5 CX70/3.5 CX120/3.5 CX240 Sq mm. XLPE by manual drill (by making moles) ((As Above Clouman B-1,B-2,B-3 & B-4 mentioned cable are laid in this technology)
Telecom works for Provisioning of CCTV & railnet at Running room Sultanpur (SLN) Station of Lucknow Division, Northern Railway
Horizontal direction drilling(HDD)/Trenchlessdigging/machine drilling withoutdamage to surface road /trackfor laying/insertion ofHDPE/GI/DWC pipe. The boreshall be done at the depth ofminimum 1400 mm from theground level. The ground levelshall be considered ignoring thebank 22 height of the bank of the road. Note:- DWC/HDPE/GI PipeSupply is not covered under thisitem. Contactor shall provide allmaterial required for work andadequate nos. of labours forproper laying of cables into thebore. Cable shall be laidcautiously so that it should notget damage due to roughhandling & pressure on cable.Payment of boring shall bemade only aft er DWC/HDPE/GIpipe is laid in the bore."
Telecom work for strengthening of telecommunication infrastructure in LKO-SLN- ZBD section of Lucknow Division of Northern Railway in view of upcoming Inspection.
Horizontal direction drilling(HDD)/Trenchlessdigging/machine drilling withoutdamage to surface road /trackfor laying/insertion ofHDPE/GI/DWC pipe. The boreshall be done at the depth ofminimum 1400 mm from theground level. The ground levelshall be considered ignoring thebank 04 height of the bank of the road. Note:- DWC/HDPE/GI PipeSupply is not covered under thisitem. Contactor shall provide allmaterial required for work andadequate nos. of labours forproper laying of cables into thebore. Cable shall be laidcautiously so that it should notget damage due to roughhandling & pressure on cable.Payment of boring shall bemade only aft er DWC/HDPE/GIpipe is laid in the bore." Insp.By Consignee.
EXTENSION AND UPGRADATION OF RUNWAY AND ALLIED WORKS AT DAMAN
Excavating in trenches, n exc 1.5 m wide and n exc 1.5m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, laying of cables, protection pipes etc. n exc 10 sqm on plan and n exc 1.5 m in depth and getting out in any type of soil complete all as specified and directed.