SPL REPAIR TO MD ACCN BLDG NO P-150/09 TO 150/16 OF FD HOSP AT MIL STN ALWAR
Excavating in trenches not exc 1.5 metre wide and not exc 1.5 metre in depth for foundation or for shafts, walls, manholes, laying of cables, pipes etc not exc 10 Sqm on plan and getting out in soft/loose soil complete all as specified & directed.
CA NO. GE AF NO.1 / GUR-58 / 2026-27 DAY TO DAY MAINTENANCE OF ELECTRICAL SUBSTATIONS, ELECTRICAL FITTINGS OF E/M INSTALLATIONS AND MISC AREAS AND COMPREHENSIVE MAINTENANCE OF E/M INSTALLATIONS WITH CONNECTED ITEMS AT 54 ASP AF STATION GURGAON UNDER
(viii) The Electrician and helper will be interviewed by JE E/M /Engr-in-charge for verification of experience, character and sound mind and body. (ix) Cost of materials for laying of cables, stretching of OH conductor, burnt out joints, fuse wires, insulator and jumper will be measured and paid separately under relevant items as Material & Labour. (x) The contractor will have to provide additional resources as per the direction of Engr-in-Charge for speedy disposal of complaints as and when required. If any manpower is absent penal charge @ Rs 1000/- per person will be levied to the contractor. Penal recovery @ Rs 500/- per complaint per hour will be levied from the contractor in case of late attending of complaint after reasonable time or 2 hours whichever is more as decided by Engr-in-Chage / GE (xi) The scope of work cover all complaints received from above concern power houses will be lodged/docketed/attended/completed. The completion will be rendered on complaint register as well as on docket.
8248/E8
Excavation in trenches Hard/Dense, not exceeding 1.5 m wide and not exceeding 1.5 m in depth; for foundation, etc. or for shafts, valve pits, wells, cesspits, manholes, pier holes,laying of cables/pipes etc. not exceeding 10 sq m on plan and not exceeding 1.5 m in depth and getting out in Soft/disintegrated soil complete all as specified and directed.
Augmentation and Upgradation of 66 11 KV Grid Substation at PGIMER, Chandigarh.
Excavation for cable trench in soft soil, dept upto 1.2M including dressing of side lift upto 1.5M, Including getting out the excavation soil, rifilling with sand and or good soil after laying of cables/pipes etc. in layers of 20cm, ramming, watering and disposal of surplus of excavated soil as directed with in lead of 50 meter.
REP OR REPLACEMENT OF SEWAGE SYSTEM BY CLEANING OF SEWAGE LINES MANHOLES GULLY TRAP AND SEPTIC TANK ETC AT NP LINE GNC LINE VNC AND VOC AREA UNDER AGE BR-II OF GE (CENTRAL) BANGALORE
Excavation in trenches and not exe. 1.5 m wide and not exe. 1.5 m in depth for foundation of drain, man hole , laying of cables , stay etc. not exe. 10 Sq. m on plan and not exe. 1.5 m depth and getting out in soft/loose soil complete all as specified and directed.
REP AND REPLACEMENT OF SEWAGE SYSTEM BY CLEANING SEWAGE LINES MANHOLES GULLY TRAP AND SEPTIC TANK AT OTM ACCN OF ASC CENTRE (SOUTH) UNDER GE (CENTRAL) BANGALORE
Excavation in trenches and not exe. 1.5 m wide and not exe. 1.5 m in depth for foundation of drain, man hole , laying of cables , stay etc. not exe. 10 Sq. m on plan and not exe. 1.5 m depth and getting out in soft/loose soil complete all as specified and directed.