Loading…
Loading…
2,581 results • Best match
Tender of Labour Work for Erection and Maintenance of HT,LT & TC Work Under ND and other Scheme under Barwala Sub Division
Laying / re-laying XLPE/PILC cable by digging of pits, removal of old cable and laying of new
Tender of Labour Work for Erection and Maintenance of HT,LT & TC Work Under SPA and other Scheme under Botad Town 2 Sub Division
Laying / re-laying XLPE/PILC cable by digging of pits, removal of old cable and laying of new
REPAIR MAINT OF LT SUPPLY SYSTEM EXTERNAL ELECTRIFICATION AND CONNECTED MISC ITEMS OF WORK AT RHENOCK AND RONGLI UNDER GE 867 EWS
Supply and Laying cable XLPE insulated, armoured heavy duty electric cable with aluminium conductor, 1100 volts grade, cross-sectional area 95 sq. mm 3.5 core complete all as specified and directed. Make : MESCAB/HAVELLS/POLYCAB/KEI/GLOSTER or equivalent as approved by GE.
Replacing of old deteriorated LT overhead line into underground system from Main gate LT panel to Filter House at Catchment area.
Materials & Labours for XLPE insulated, armoured heavy duty electric cable with aluminium conductor, 1100 volts grade, 3.5 core cross-sectional area 50 sq. mm cable laying through pipe & trench termination with proper lugs and glands as to be done as directed by site in charge. Make: Havells/V-Guard/Gloster/KEI/L&T
SPECIAL REPAIR REPLACEMENT TO HT LT SWITCHES PANELS HT CHANGEOVER WITH COMPACT SUBSTATION INCLUDING REPLACEMENT OF OLD HTLT CABLES AND ALLIED WORKS AT VARIOUS EM INSTALLATIONS ATAF STN SINGARSI UNDER AGEIAF SINGARSI
M & L for HDPE conduit of size 32 mm for laying cables in road crossings/drain crossings including necessary clamps/other accessories for laying the conduit along/across the drain, complete all as specified & directed by Engr-in-charge.
Increasing capacity of 33/11kv Sub-stations Jamalpur, Aligarh Under Business Plan 2026-27
Cable Laying (11 KV 3X185sqmm): Laying 11 KV, 3x185mm2 XLPE, Power cable from outgoing switch gear to 11 KV double poles in the cable trench 0.50m wide, 0.90m depth. Providing 150 thickness mm local sand for cushion beneath and 150mm above the cable (quantity of local sand required 0.375 cubm/m in length). The cable shall be duly protected by brick. On both side of cable by laying bricks vertically and bricks would also be laid horizontally on top of vertically laid bricks along the single cable (minimum 18 Nos. of bricks are to be laid top and outer side along the single cable. The work includes digging of trenches, laying of cable in under ground trenches, joining of terminal’s, back filling of earth and testing and commissioning of power cables etc. Spare cable shall be left over and laid in the trenches in shape of 6m rings at both ends. At the end of feeder cables, where the cable is to be laid across pucca/main road, 100 mm dia G.I. pipe will be weared over the cable in the cable trench for the protection of cable.