Loading…
Loading…
2,581 results • Best match
PROVISIONING OF POWER SUPPLY CABIL FOR SRCG ECL BEACON AND IPMS LABS AT RAJAWAT BLOCK NSRY SVP UNDER GE HADDO SRI VIJAYA PURAM
Material and Labour for cutting existing BT / PCCroad of size 45cm x 60cm for taking out/laying of underground cable/pipe and including necessary earth work and refilling the same in layers well ramming including watering as required and matching with the existing surface with 200mm thick PCC 1:2:4 type B1 and curing the same with wet gunny bags and removing debris to a distance not less than 50m complete all as specified and as directed .
Construction of 33 KV Line Vikas nagar and construction of one circuit 33 KV line Big bazar from surya hotel to Redisson blu Distt Gorakhpur
Laying from switchyard to control room for 33 KV panel, CT, VCB by digging trench and making connection complete. (As per site requirement laying of cable though cable trench if available with covering brick and sand.
Electrical renovation related to load capacity upgradation for the office of the Superintending Engineer Planning CircleII PH E Dte Bikash Bhawan
Laying of cable having following size, on wall/ surface including S & F MS clams with earthing attachment having following size GI (Hot Dip) Wire, making hole etc. as necy., mending good damages and painting Laying of cable from 3/3½ core 35 sqmm to 50 sqmm on wall/surface incl. S & F MS saddles with earthing attachment in 2x 10 SWG GI (Hot Dip) Wire, making holes etc. as necy., mending good damages and painting
50/SE(T)/LCZ/2026-27
S/C LT XLPE 3.5x400 sqmm Cable laying in Metalic/Damar/normal soil Road by Manual method as per site condition. (All the material required for laying will be supplied by the contractor except 11 KV XLPE cable)
REPAIR MAINT OF EXTERNAL ELECTRIC LT DISTRIBUTION SYSTEM AT KHUNMOH UNDER GE 861 EWS
Material and Labour sand cushioning, with dry and clean fine river sand for underground cable 8 cm before laying cable and 15 cm after laying and punned to 18 cm after laying of cable complete all as spefied and as directed by Engineer-in-Charge. (Note:- Punned thickness shall be considered for payment purpose)
Provision of redundancy in power supply for BPAC in BG-IV section of Alipurduar division.
Excavation of trench to a depth of 1 Mtr. for track crossing of cables, laying of DWC/ RCC pipes with collar/coupling, refilling of trench by ramming and consolidating it as per the 08 instructions of Railway representative at site. During excavation of trench it has to be ensured that the excavated soil does not mix with the ballast available. The depth of 1m trench shall be from the bottom of sleepers for track crossings. Laying of cables is not included in this schedule. (Supply of DWC/RCC pipes with couplers/ collars is not included in this schedule).