Loading…
Loading…
2,581 results • Best match
Repairing work of Electricity Lines, Poles and Transformers due to natural disaster at Jainti Section of EDD Almora with supply of all decentralised material
Laying of AB Cable (1x16+25 mm
SPECIAL REPAIR TO PANELS, BOARDS AND POWER CIRCUITS ALONG WITH CONNECTED ITEMS IN SHOPPING COMPLEX AND NALANDA LIBRARY AND SPL REPAIR TO BLDG NO P37 OF BBSR UNDER GE (I) GOS
Taking up/down old unsv underground cable from existing locations and supply, laying and testing cable XLPE insulated,screened,PVC bedded,galvanized steel strip or wire armoured,electric power cables 1100 volts grade with stranded aluminium conductor of size 16 sqmm,4 core complete all as specified and directed.
REPAIR/MAINT OF LT UG CABLE, FEEDER PILLER BOXES, PANEL BOARDS, SWITCH GEARS, JOINT FAULT DETECTOR, LEAKAGE, CHANGE OVER, OTHER E/M ALLIED WORKS IN DOMESTIC AND TECHNICAL AREA AT AF STN SULUR
Supply and laying UG cable XLPE insulated, screened, PVC bedded, galvanised steel strip or wire armoured, electric power cable heavy duty with aluminium conductor 1100V grade cross sectional for the following sizes laid in trenches /ducts/ fixed to wall/ pole/ inside panel/ drawn through pipe along with cable glands and terminal sockets, including taking down existing cable etc complete all as specified and as directed.
GE/PGH/04 OF 2026-27 (8753/PGH/E8)
Excavation in trenches n. exc. 1.5 mtr wide and not exceeding 1.5 mtr in depth for laying of underground cable and getting out in soft/loose soil complete all as specified and directed.
18/SE(T)AMAUSI ZONE/2026-27
All Decentralized Items Provided/Fixing/ Erection/Installation/Laying/Foundation with earthing by the contractor as on his own cost as per RESPO Narms. 33 KV LINE ERECTION WORK Minimum depth of laying from ground surface to the top of cable as per IS is 1)Low Voltage (1.1KV) and control cable 0.75 Mtr 2) 3.3 KV to 11 KV Cables 0.90 Mtr 3) 22 KV to 33 KV Cable 1.05 Mtr 4) Cables at Road Crossing 1.00 Mtr 5) Cable at Railway Laval Crossing ( measured from bottom 1.00 Mtr Of sleepers to top of pipe) Note- 1- The depth may be increased but not more than 1.6 Mtr 2- The Standerd depth and width for laying the cable are also attached ( as per letter No 561/Director(Tech)/MVVNL/Camp/Dt 09.01.2026 with the tender form)
SPECIAL REPAIR AND ADD/ALTN TO LT EXTERNAL ELECTRIC SERVICES AGAINST JON NO. W/SRW/ ELECTRIC SERVICE/2025-26 UNDER GE 861 EWS
Material and Labour sand cushioning, with dry and clean fine river sand for underground cable 8 cm before laying cable and 15 cm after laying and punned to 18 cm after laying of cable complete all as specified and as directed by Engineer-in-Charge. (Note:- Punned thickness shall be considered for payment purpose)