Loading…
Loading…
2,579 results • Best match
Increasing capacity of 33/11kv Sub-stations Atrauli New, Aligarh Under Business Plan 2026-27
H.T. Power Cable Laying (11 KV 3X300sqmm): Laying 11 KV, (3x300) mm2 XLPE, Cable from power transformer to 11 KV incoming switch gear in the cable trench 0.45 m wide, 0.90m depth. Providing 150 mm local sand for cushion beneath and 150 mm above the cable (quality of local sand required 0.375 cum/m in length). The cable shall be dully protected by brick. On both side of cable by laying brick vertically and bricks would also be laid bricks along the single cable (minimum 18 Nos. of bricks are to be laid top and outer side along the single cable. The work includes digging of trenches, laying of cable in under ground trenches, joining of terminal’s, back filling of earth and testing and commissioning of power cable etc. Spare cable shall be left over and laid in the trenches in shape of 6 m ring at both ends.
REPAIR/MAINTENANCE OF OVERHEAD (OH) LINES AND UG CABLES, INCLUDINNG ROUTINE PREVENTIVE AND BREAKDOWN MAINTENANCE OF TRANSFORMERS, AB SWITCHES, LIGHTNING ARRESTERS (LAs) EARTHING SYSTEMS AND ALL ASSOCIATED ALLIED ELECTRICAL WORKS, AT ZONE- II C AND A
Supply and laying in replacement of GI tubing 100 mm dia, light grade for cable protection at road crossing / on poles and tubing sealed at both ends after laying the cables complete all as directed.
REPAIR/MAINTENANCE OF OVERHEAD (OH) LINES AND UG CABLES, INCLUDINNG ROUTINE PREVENTIVE AND BREAKDOWN MAINTENANCE OF TRANSFORMERS, AB SWITCHES, LIGHTNING ARRESTERS (LAs), EARTHING SYSTEMS AND ALL ASSOCIATED ALLIED ELECTRICAL WORKS, AT ZONE- II B AND
Supply and laying in replacement of GI tubing 100 mm dia, light grade for cable protection at road crossing / on poles and tubing sealed at both ends after laying the cables complete all as directed.
REPAIR / REPLACEMENT OF STREET / SECURITY LIGHTS AND MISCELLANEOUS WORKS OF MD ACCN UNDER GE (A) SURATGARH AT SURATGARH MIL STN
Excavation in trenches, not exc 1.5 m wide and n. exc 1.5 m depth; or n exc 10 Sqm on plan and n exc 1.5 m in depth for foundations of poles, struts, stays, joints or laying underground cable etc. in soft/loose soil, & getting out including taking out old brick or precast cable cover complete all as specified and directed by Engineer-in-Charge.
REPAIR MAINTENANCE IMPROVEMENT OF HT SYSTEM AND MAINTENANCE OF HT BREAKER AND CONNECTED ALLIED WORKS IN AOR OF GE SAMBA UNDER MIL STN SAMBA
Material and Labour for dry fine sand cushioning to under ground cables 8 cm thick before laying the cable and 15 cm thick after laying, stretching and testing the cable all as direted. Note: Punned thickness shall be measured & paid.
S.I.T.C of Air Conditioning System at different Ejlases under District Court Campus Asansol ,Paschim Bardhaman..Electrical Installation Work..
Laying of cable as below, on existing Cable Tray and binding & laying properly with suitable size GI wire . (i). From 70sqmm to 150sqmm.