Loading…
Loading…
10,403 results • Best match
Overhead Laying, Testing, Installation and Commissioning of new 3.5 Core x 95 sq.mm Al. Conductor XLPE Power Cable in BVFCL Daily Market
Laying and installation of both 1100 grade 3.5 Core x 95 sq.mm Al.conductor XLPE Power Cable XLPE insulated armored power cable cables of along the trench for a length of 150 mtr.(approx) throughout cable route . This includes piping-work at (necessary places), shifting of material from one place to another, providing steel /GI pipe wherever required. Power Cable & MS Pole will be supplied from BVFCL GI Pipe of suitable height and cable clamps for cable dressing shall be provided by contractor party
OFC Constructions and cable laying related works at Bhogapuram airport Vizianagam OA
GMR airport jn duct entry point to Airport utility block 45 (M/s GMR already laid duct) - Cable pulling only
Fabrication, supply, installation, testing and commissioning of PMCC panels, power and control cabling work, cable laying and cable end terminations etc.
Installation of 3.5 C x 95 Sq.mm. Cu conductor Armoured cable.
Optical Fibre Cable (OFC) laying construction work in Jamshedpur Business Area (BA).
Excavation of trench (open / HDD) for PLB pipe laying, Backfilling, Reinstatement and Compaction after laying of PLB pipe, laying/ blowing of optical Fibre Cable inside laid PLB pipe, splicing and jointing of Optical Fibre Cable including supply of As Built Diagram (ABD) of constructed OFC Route and Acceptance Testing, commissioning and makeover of the routes. The work also includes road / bridge crossing, laying of PLB inside DWC pipe wherever required. The cost shall include provisioning /construction & fixing of joint chamber, manhole, provisioning ,fixing , painting and sign writing of Route/Joint Indicators, termination at FTB and all the relevant accessories etc. and end to end testing of dark and lit fibre (For Underground laying) (As per the Specification).
Optical Fibre Cable (OFC) laying construction work in Hazaribagh Operation Area (OA)
Excavation of trench (open / HDD) for PLB pipe laying, Backfilling, Reinstatement and Compaction after laying of PLB pipe, laying/ blowing of optical Fibre Cable inside laid PLB pipe, splicing and jointing of Optical Fibre Cable including supply of As Built Diagram (ABD) of constructed OFC Route and Acceptance Testing, commissioning and makeover of the routes. The work also includes road / bridge crossing, laying of PLB inside DWC pipe wherever required. The cost shall include provisioning /construction & fixing of joint chamber, manhole, provisioning ,fixing , painting and sign writing of Route/Joint Indicators, termination at FTB and all the relevant accessories etc. and end to end testing of dark and lit fibre (For Underground laying) (As per the Specification).
Optical Fibre Cable (OFC) laying construction work in Dumka Operation Area (OA).
Excavation of trench (open / HDD) for PLB pipe laying, Backfilling, Reinstatement and Compaction after laying of PLB pipe, laying/ blowing of optical Fibre Cable inside laid PLB pipe, splicing and jointing of Optical Fibre Cable including supply of As Built Diagram (ABD) of constructed OFC Route and Acceptance Testing, commissioning and makeover of the routes. The work also includes road / bridge crossing, laying of PLB inside DWC pipe wherever required. The cost shall include provisioning /construction & fixing of joint chamber, manhole, provisioning ,fixing , painting and sign writing of Route/Joint Indicators, termination at FTB and all the relevant accessories etc. and end to end testing of dark and lit fibre (For Underground laying) (As per the Specification).