Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.1 LAccepted-AOC | ₹17.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹17.5 LRejected-AOC 140 1 110 N S C BOSE ROAD REGENT PARK KOLKATA WEST BENGAL 700040 | KOLKATA | KOLKATA | WEST BENGAL | 700040 | ₹17.5 L | L2 | Rejected-AOC L2 |
| 3 | L3₹18.0 LRejected-AOC 144 ARABINDA ROAD BOWBAZAR KRISHNAGAR NADIA 741101 | KRISHNAGAR | NADIA | WEST BENGAL | 741101 | ₹18.0 L | L3 | Rejected-AOC L3 |
| 4 | Rejected-Technical 418 KALITALA PARK KOLKATA KOLKATA KOLKATA 700070 | 24 PARAGANAS SOUTH | WEST BENGAL | 700070 | - | - | Rejected-Technical Non-compliance of documents |
| Sl No | Description | Qty | Unit | M/S ROY ENGINEERING L1 | T C GHOSH CO L3 | S S ENTERPRISE L2 |
|---|---|---|---|---|---|---|
| 1.00Erection work Details | ||||||
| 1.01 | FIXING OF 11 KV PIN INS | 18 | NOS | 61.74 ₹1,111.32 | 65 ₹1,170 | 64 ₹1,152 |
| 1.02 | EXCAVATION OF SOIL FOR FORMATION OF CABLE TRENCHES & RE INSTATEMENT OF CABLE TRENCHES WITH THE EXCAVATED SOIL & LAYING OF BRICK (16 NOS/MTR) | 470 | CUM | 19.6 ₹9,212 | 25 ₹11,750 | 21 ₹9,870 |
| 1.03 | SUPPLY OF BRICK | 2,880 | NOS | 7.23 ₹20,822.40 | 10 ₹28,800 | 8 ₹23,040 |
| 1.04 | LAYING OF BRICK | 2,880 | NOS | 1.1 ₹3,168 | 2 ₹5,760 | 2 ₹5,760 |
| 1.05 | RISING OF XLPE CABLE BY GI PIPE 100 MM DIA (MED) TATA/JINDAL.(3m/pipe) | 48 | MTR | 761.46 ₹36,550.08 | 790 ₹37,920 | 778 ₹37,344 |
| 1.06 | LAYING OF 300 SQ MM XLPE CABLE | 1.7 | KM | 60,760 ₹1.0 L | 65,000 ₹1.1 L | 62,001 ₹1.1 L |
| 1.07 | MICROTUNNELING WORK with 110m HDPE Pipe PE-80 PN-6 (Corrigendum Order No-40 ; 08.10.2021 of CED) | 1,523 | MTR | 805.06 ₹12.3 L | 850 ₹12.9 L | 822 ₹12.5 L |
| 1.08 | FIXING OF LA | 6 | SET | 332.22 ₹1,993.32 | 350 ₹2,100 | 340 ₹2,040 |
| 1.09 | Supply and Fixing of 11KV St Thr jointing Kit 3CX300.mm (Make-Raychem) | 7 | NOS | 18,642.5 ₹1.3 L | 19,035 ₹1.3 L | 19,024 ₹1.3 L |
Tender Value
₹17.4 L
EMD Value
₹34,812
Closing Date
27 Mar 2026, 2:00 pmClosed
Divisional Manager
Ranaghat Divisional Office, WBSEDCL. Administrative Building, Krishak Bazar, NH12, Begopara, Ranaghat, Dist Nadia. Pin741256
Erection works i.e. 1. Laying of 11 KV 300 sqmm XLPE UG cable through Micro-tunnelling, 2. Supply and fixing of 300 sqmm OD and Str.Thr jointing kits, 3. Fixing of LA, etc. at Birnagar 33/11 KV sub-station under Ranaghat Division.
2026_WBSED_1014941_1
Ranaghat/e-Tender/25-26/05
Open Tender
Miscellaneous Services
60 days
Birnagar 33/11 KV Sub-station
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹34,812
Yes
Ranaghat Division
3 Jun 2026
2 Mar 2026
30 Mar 2026
2 Mar 2026
27 Mar 2026
6 Mar 2026
5 Mar 2026
Erection work Details
FIXING OF 11 KV PIN INS
EXCAVATION OF SOIL FOR FORMATION OF CABLE TRENCHES & RE INSTATEMENT OF CABLE TRENCHES WITH THE EXCAVATED SOIL & LAYING OF BRICK (16 NOS/MTR)
SUPPLY OF BRICK
LAYING OF BRICK
RISING OF XLPE CABLE BY GI PIPE 100 MM DIA (MED) TATA/JINDAL.(3m/pipe)
LAYING OF 300 SQ MM XLPE CABLE
MICROTUNNELING WORK with 110m HDPE Pipe PE-80 PN-6 (Corrigendum Order No-40 ; 08.10.2021 of CED)
FIXING OF LA
Supply and Fixing of 11KV St Thr jointing Kit 3CX300.mm (Make-Raychem)
Supply and Fixing of 11KV ID/OD jointing Kit 3CX300q.mm (Make-Raychem)
Making protective duct for cable joint complete as per WBSEDCLs approved drawing (Ref. Drg. no.PLN(D)/SS/106, dt. 05.05.2015)
Supply & Erection of Cast Iron Cable Marker on concrete foundation blocks for straight run, road crossing, joint location etc as per drawing no..PLN(D)/SS/107 or 108, dt. 05.05.2015 & specification & direction of Site Engineer.
Dismantling of HT AB Cable 3X120SQMM & Return to Store
GIS Survey
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 22.39 MB
BOQ_2492944.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid