Loading…
Loading…
8,338 results • Best match
Annual Rate contract for Erection and Maintenance work of HT/LT Line and TC Structure and Laying, Testing & Commissioning of 11/22KV underground XLPE cable with cable end termination & straight though jointing kits under Various Scheme under Jambusar Town & Other Sub Division under Bharuch Rural Division
considered on account of the above repairing/modification of civil work.
Annual Rate contract for Erection and Maintenance work of HT/LT Line and TC Structure and Laying, Testing & Commissioning of 11/22KV underground XLPE cable with cable end termination & straight though jointing kits under Various Scheme under Vagra & Other Sub Division under Bharuch Rural Division
considered on account of the above repairing/modification of civil work.
Annual Rate contract for Erection and Maintenance work of HT/LT Line and TC Structure and Laying, Testing & Commissioning of 11/22KV underground XLPE cable with cable end termination & straight though jointing kits under Various Scheme under Bharuch Rural Division & Other Sub Division under Bharuch Rural Division
considered on account of the above repairing/modification of civil work.
Turnkey Contract for Supply, Installation, Testing and Commissioning of 11 KV Medium Voltage Covered Conductor (MVCC) with its accessories and allied items in Porbandar Circle of PGVCL under Kisan Suryodaya Yojana (KSY) Scheme (Package 2).
considered on account of the above repairing/modification of civil work.
Turnkey Contract for Supply, Installation, Testing and Commissioning of 11 KV Medium Voltage Covered Conductor (MVCC) with its accessories and allied items in Amreli Circle of PGVCL under Kisan Suryodaya Yojana (KSY) Scheme (Package 1).
considered on account of the above repairing/modification of civil work.
At NBQ - Provision of STP (100 kld ),ETP (200 Kld) , drainage network and other ancillary work in NBQ workshop. (Project ID. 08.10.42.25.3.73.003)
... sewage/effluent, based on Membrane Bio Reactor (MBR) Technology to treat waste water with civil works and to reuse the treated water . The STP should be complete in all respect as per satisfaction ...