Loading…
Loading…
8,057 results • Best match
ROOF TREATMENT REPAIR WORK OF THE ROOF OF 33/11 KV S/S HUMAYUNPUR AND CONSTRUCTION AND REPAIR OF BOUNDARY WALL AT 33/11 KV S/S MIHAWA, SPECIAL REPAIR AND OTHER MISCELLANEOUS CIVIL WORKS AT 33/11 KV S/S VILAIPUR UNDER DISTRICT AGRA.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (DSR 10.25) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works (DSR 10.25.2)
MLA ADS 2025-26 PANNIYAM KARA ANGANVADI CRUSH BUILDING CONSTRUCTION IN VADAKKENCHERY GP-General Civil WorkCHERY GP
Building Construction.
Construction of civil structure of Dyke and RCC pad with allied civil works
Providing Structural steel work using angles, channels, joists and other sections, welded and / or bolted in built up sections for trusses , structural steel floors, frame works, monorails and other structures including supplying, cutting, welding, fabricating, hoisting, fixing in position, applying a priming coat of approved steel primer etc. complete all as per specifications, drawings and as directed by the Engineer in charge
VENTILATOR, ROOFSHEET, ROOF REPAIR, WATER SUPPLY, DRAIN WORKSHOP, ORAI CONSTRUCTION OF CIVIL WORKS AT OFFICE OF A.E.(M) ELECTRICITY TEST LAB, ORAI, DISTRICT-JALAUN
R.C.C. work with cement, approved coarse sand 2cm gauge approved stone ballast in 1:2:4 proportion for concreting in all type of piles including labour & material for proper completion of the work. Measurement of work be done according to design diameter and depth of pile upto cut off level. Under reamed concrete shall be measured as per IS 2911 Part II (CSI No. 21.07)
CIVIL REPAIR AND MAINTENANCE WORKS AT IGL CNG STATIONS
Construction of a hall above the existing AKG Smaraka Library building Ameda
OD333596/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using minimum cement content 330 kg/m3 as per approved design mix, ( excess cement is not payable) including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. There is no additional payment for excess and extra cement used by the contractor as per circular no. CE/BL/GL/6541/2015 dated 30-8-2017 All work above plinth level upto floor V level. Derived from Spec. 5.33.2.1