Loading…
Loading…
8,248 results • Best match
Annual Plan-MLA-SDF-TOILET BLOCK-ST JEROMES UP SCHOOL TOILET BLOCK IN KATTAPPANA MUNICIPALITY-General Civil Work
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
Annual Plan-PULLAMPARA GP 2026-27 PR NO 24 PAZHAYAPALLI-OTTATHENGU AATTUKAL ROAD RECONCRETINGGeneral Civil Work-WARD 13
Annual Plan-PULLAMPARA GP 2026-27 PR NO 23 THALEKUNNU-THUMPARA PAZHAYAPALLI ROAD RETARRINGGeneral Civil Work-WARD 12
5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. (B) 75 mm thick :- (II) Bitumen (S-65)
Annual Plan-PULLAMPARA GP 2026-27 PR NO 17 KOODAM-VENGAD ROAD RETARRING-General Civil Work-WARD 9
5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. (B) 75 mm thick :- (II) Bitumen (S-65)
Establishing of 2x160MVA, 220/110kV and 1x10MVA, 110/11kV Substation at Chadchan (Devar Nimbaragi) in Chadachan taluk, Vijayapura district with KIOSK based arrangement along with construction of associated 220kV transmission line for a distance of ... with construction of ... and Civil Works) ... Civil Works ) ...
a) Establishing 2X160MVA, 220/110 kV & 1X10MVA, 110/11kV sub-station with "KIOSK Based arrangement" at Chadachan (Devarnimbaragi) in Chadachan taluk, Vijayapur district. b) Construction of 220KV DC line on DC towers from existing 220kV Indi sub-station to proposed 220kV Chadachan (Devaranimbaragi) sub-station for a distance of 29.628Kms using AAAC Moose conductor in Indi Taluk Vijayapur District. c) Construction of 2 nos. of 220 kV Terminal Bays at the existing 220/110kV Indi sub-station for terminating 220kV DC line from the proposed 220kV Chadachan sub-station in Indi taluk & Vijayapur district d) Construction of 110 KV DC line on DC towers from proposed 220kV Chadachan (Devarnimbaragi) sub-station to 110 kV Dhulkhed sub-station for a distance of 27.317kms using Panther conductor in Indi Taluk , Vijayapur District. e) Construction of 2 nos. of 110 kV Terminal Bays at the existing 110/11 kV Dhulakhed sub-station for terminating 110kV DC line from the proposed 220kV Chadachan sub-station in Indi taluk & Vijayapur district f) Construction of 110 KV DC line on DC towers from proposed 220kV Chadachan (Devarnimbaragi ) sub-station to 110 kV Jigajevanagi sub-station for a distance of 5.843kms using Panther conductor in Indi Taluk , Vijayapur District. g) Construction of 2 nos. of 110 kV Terminal Bays at the existing 110kV Jigajevanagi sub-station for terminating 110kV DC line from the proposed 220kV Chadachan sub-station in Indi taluk & Vijayapur district. h) Construction of 110 KV SC line on DC towers from proposed 220kV chadchan(Devarnimbaragi) sub-tation to 110 kV Kerur sub-station for a distance of 19.16kms using Panther conductor in Indi Taluk , Vijayapura District. i) Construction of 1 no. of 110 kV Terminal Bay at the existing 110kV Kerur sub-station for terminating 110kV SC line from the proposed 220kV Chadachan sub-station in Indi taluk & Vijayapura district. j) Construction of 110 KV LILO line from existing 110KV Zalki-Chadachan line to proposed 220kV Chadachan(Devarnimbaragi) station using Lynx conductor for a distance of 8.460kms in Indi Taluk, Vijayapur District. on Partial Turnkey basis, including Supply of all Materials/Equipments (Excluding Supply of 1X10MVA,110/11kV Power Transformer & 11kV Switchgear), Erection (including Dismantling and Civil Works) of all Materials/Equipments, Testing and Commissioning.
Maintenance work
OD60815/2026-2027:Hire charges of JCB for site clearing and other allied works.