Loading…
Loading…
8,248 results • Best match
Upgradation/Renovation to 196 MPs Flats at South Avenue under Sub-Div.-III of PaWD-III, New Delhi, dg. 2026-27. (SH: Providing factory made High end Aluminium Windows in various MPs Flats at South Avenue). Subwork/Packages: Civil Work
Construction of Govt. Girls High School Building Vikrampur, Block Dindori District Dindori
Construction of Govt. Girls High School Building Vikrampur, Block Dindori District Dindori
Proposed New DSC Guard Room and Modification to Existing Office Rooms of Security Building including Civil and Electrical Works at Helicopter Division HAL HC
ADDITION ALTERATION AND SPECIAL REPAIR TO BUILDING NO T 47 AND ADDITION ALTERATION AND SPECIAL REPAIR TO SEWAGE LINE AND STP IN INS ABHIMANYU AND CHARIOT COMPLEX AT NAVAL STATION KARANJA
S&F for PVC False ceiling consisting of 600 mm x 600 mm, 8-10mm thick prelaminated self design including frame work made using aluminium T section of size (25mm x 25 mm, 19 gauge or 1mm thick) in square pattern of grid size of 600 x 600 mm. The aluminium frame work is supported from the ceiling with the help of GI wire/6 mm dia GI (upto 1200 mm length) adjusting and maintain for proper level to roof salbs by means of ceiling cleats made out of GI flat 40x3 mm sie 60mm long and expansion hold fasterners 12.5mm dia 40mm long complete etc. The aluminium frame work is supported on side wall with the use of aluminium 25 mm X 25 mm angles complete as per direction of Engr-in-charge, Manufacturer's specification & drawing.(Note:- Items rate shall be include upto 20.00 meter height of bldgs for scaffolding as all arrangement complete all as specified and directed by Engr-in-Charge.
GENERAL-urgent maintenance to PWD Buildings Circle office,Thrissur-urgent maintenance to PWD Buildings Circle office,Thrissur-General Civil Work
civil works
GENERAL- Budget Work 2025-26 ( Substitution work)Improvements by providing 40mm CC To Veliyam Unnathy Aaroorkonam Road Ch 0/000 to 0/650-Veiyam Grama Panchyath Kottarkkara LAC-General Civil Work
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)