Loading…
Loading…
8,494 results • Best match
Constructing Grampanchayat office Building at Bhalaval
... door frame 60mm x 100mm stainless steel fixtures and fastening and finishing the wood work with oil painting 3 coats. (Excluding the door frame) BD-T-7 and 8 Page One Number 481-82 ...
Upgradation/Renovation/Special repairs of electrical works at newly allotted/occupied bungalows/flats at Tilak Lane, Bapa Nagar and Kaka Nagar under service centre (201,202&203) SD-1/DED-11,CPWD, New Delhi during 2026-27. (SH: SITC of LED Luminaires )
REPAIR/RENOVATION OF BATHROOM TILING, SANITARY FITTINGS AND REPAIRS TO SUNKEN FLOOR/WALL OF CERTAIN BATH WC AND MISC WK BY NON-DESTRUCTIVE METHOD AND REPAIR/REPLACEMENT OF SERVICE WATER TANK INCLUDING CLEANING AND CERTAIN MISC ITEMS AT CME UNDER GE
... floors and walls of bath, WC, WHB and urinals (combined unit) with using non destructive construction chemical methods such as hydrophobic PU grouting, Epoxy coating etc including cleaning... including cleaning of surface with wire brush and detecting the sources of leakages and repairing surfaces all as per manufacturers instructions & directed. NOTE : The rate is inclusive ...
M/o STP (Existing STP based on SBR Technology core Parts (Decanter core part, diffuser, PLC SCADA and Related work) (Renovation and Strengthening work of the existing 33 MLD STP Core Parts with MPS at Sector-54) Noida (PART-C)
... Turbo Blowers as a stand by arrangement Capacity - 4800 Nm3/h @0.60 Kg/cm2 & all complete work as above items. direction by Engineer-in-charge b) Replacement of Twin Lobe Blower with ...
M/o STP (Existing STP based on SBR Technology core Parts (Decanter core part, diffuser, PLC SCADA and Related work) (Renovation and Strengthening work of the existing 50 MLD STP Core Parts with MPS at Sector-168) Noida (PART-A)
... Turbo Blowers as a stand by arrangement Capacity - 4900 Nm3/h @0.60 Kg/cm2 & all complete work as above items. direction by Engineer-in-charge b) Replacement of Twin Lobe Blower with ...
M/o STP (Existing STP based on SBR Technology core Parts (Decanter core part, diffuser, PLC SCADA and Related work) (Renovation and Strengthening work of the existing 35 MLD STP Core Parts with MPS at Sector-123) Noida (PART-D),
... Turbo Blowers as a stand by arrangement Capacity - 5100 Nm3/h @0.60 Kg/cm2 & all complete work as above items. direction by Engineer-in-charge b) Replacement of Twin Lobe Blower with ...