Loading…
Loading…
8,367 results • Best match
GENERAL Kuravilangad By pass Road Construction Balance Work in Kuravilangad town link Road at ch 0000 to 1130 KM Work General Civil Work
2.4.4.D:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Dry rubble masonry
DEPOSIT-Fisheries Department-Urgent repair to the Compound wall of the Office of Deputy Director of Fisheries Kasargod district-General Civil Work
15.10.2:Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually / by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge:In cement mortar
DEPOSIT-Routine maintenance works at various buildings in Govt Ayurveda Medical College Hospital Thripunithura 2026- maintenance works-General Civil Work
14.1.1:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand)
Civil, WS and sanitary and electrical works
Repair & Renovation of Girls' Hostel No. 1 and 2 at AAU, Jorhat
Repair Renovation of Trust Office Building Phagwara
Repair Renovation of Trust Office Building Phagwara.
GENERAL Sabarimala Festival Works 2025 26 Improvements by providing BM BC to Pannivizha Parakkodu Theppupara road Pannivizha Palamukku ch 0 000 3 300 in Adoor LAC General Civil Work General Civil Work
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)