Loading…
Loading…
92,904 results • Best match
Additional Works - Plumbing, Sanitary, False ceiling, Civil Finishing works.
Civil - Finishing Work
Electrical Repair works for Emergent safety measure against civil works at inside of the UNB, Fraser building, Central OT, chest bldg. forensic bldg, boyes hostel, lady doctors hostel, doctors quater, compund light,subhas mukherjee bldg, ABCC bldg,
Supplying & Fixing CRC sheet metal (16 SWG) JB-cum- Switch Board of the following sizes complete with three no. suitable size Copper bar with holes (for Ph, N & E) fixed on bakelite/Hard Rubber insulator over the MS welded chairs incl. bakelite/Perspex/coloured Perspex (wall matching colour) top cover 3 mm thick flushed in wall for housing the board after cutting the brick wall incl. making earthing attachment,painting and mending good damages to building works [E-3/10]
Annual Plan-CKD 128/25-26 Construction of Anganvadi Building at Manjappetty in ward 16 of Chokkad GP-CKD 128/25-26-General Civil Work
ANGANAVADI CONSTRUCTION
Annual Plan-CKD 128/25-26 Construction of Anganvadi Building at Manjappetty in ward 16 of Chokkad GP-CKD 128/25-26-General Civil Work
ANGANAVADI CONSTRUCTION
Construction of Civil Work in POCSO Court No. 02
Providing and fixing welded mesh/expanded metal mesh in frame work, flat iron beading 20x3mm including top cross laps inside and out sides welding, iron bolts, crews, clips etc. complete (excluding frame work) of size.
Construction of a toilet under the stair room of Hybrid CCU including covering of drain, improvement of backside entry and some minor repairing works of existing ward of NBMCH, Darjeeling. Civil Work
Labour for fitting and fixing U.P.V.C. pipes for above ground work including cost of jointing materials etc. fitting and fixing all necessary specials, cutting pipes, cutting holes in walls or R.C. floor where necessary and mending good all damages excluding the cost of masonry or concrete work, if necessary, but including the cost and fitting and fixing holder bat clamps (any floor) or for underground work including cutting trenches upto 1.5 metre and refilling the same complete as per direction of the Engineerin-charge. (Payment will be made on centre line measurement of the total pipeline including specials. (A) Above ground (iii) 160 mm dia.