Loading…
Loading…
92,904 results • Best match
Civil works for repair of the existing drains in line with hydrological network improvement in Barauni Refinery (PHASE-2).
Total Items details of "Civil works for repair of the existing drains in line with hydrological network improvement in Barauni Refinery (PHASE-2)".
Various Joinery repair work under Sub Dn Civil Line II. Jaipur
eProcurement System Government of Rajasthan Created By: Jaiprakash Yadav Created Date/Time: 19-Jun-2026 07:12 PM Tender Title: Various Joinery repair work under Sub Dn Civil Line II. Jaipur Tender ID: 2026_CEPWD_564870_9
Various Sanitary repair work under Sub Dn Civil Line II, Jaipur
eProcurement System Government of Rajasthan Created By: Jaiprakash Yadav Created Date/Time: 23-Jun-2026 12:55 PM Tender Title: Various Sanitary repair work under Sub Dn Civil Line II, Jaipur Tender ID: 2026_CEPWD_566921_1
Facility Management Services - LumpSum Based - Educational Institute; Repair & Maintenance of Civil Work, Plumbing; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Educational Institute; Repair & Maintenance of Civil Work
Civil works Electrification works Fire Fighting works Lift works and Solar works
Supply, erection, commissioning of additional length of Exhaust Pipes with long radius bend from silencer with necessary clamps, fixtures, civil works andthermal insulation with 50 mm thick glass wool and with 1.0 mm thick aluminium sheet cladding of following adequate size including suitable rain cap for top to avoid rain water entry. The distance between exhaust pipe at top and rain cap should be higher than diameter of pipe. The horizontal run of exhaust piping should slope downwards away from engine to the condensate trap. Silencer should be installed with drain plug at bottom. Fixing shall be done with proper clamps, expansion bolts, and all other acessories as instructed by the Engineer and the rate inclusive of all minor civil works required, bolts, clamps etc as required for istallation. Support to exhaust piping should be done in such a manner that load of exhaust piping is not exerted to turbocharger. Exhaust pipe height shall be 3m more than the top of any adjacent building withing 10m radius of the exhaust.
GENERAL Running Maintenance urgent special repairs in PWD Rest house PWD offices Neyyattinkara 6 months Ist half 2026 Work General Civil Work Neyyattinkara 6 months Ist half 2026 Work General Civil Work
12.48:Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately)