Loading…
Loading…
8,021 results • Best match
GENERAL-Bridge Safety-Ordinary Repair of Pallithazham Bridge, Manjali Bridge, Kesavathuruth Bridge (Sluice cum Bridge) and Thathapilly Bridge in Paravur Constituency Bridge Safety-General Civil Work
OD63168/2025-2026:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .
MLA ADF-CWSS to Oachira and adjoining Panchayath-General Civil Work- Construction of New tube well at Ward no.13 in Clappana Panchayath
Construction of tube well and pump house
Roasting Furnace Shed and EC Unit Civil and allied works for the construction of Active Sludge Roasting Furnace Shed and Electro Coagulation Treatment System at NFC, Hyderabad.
Roasting Furnace Shed and EC Unit: Civil and allied works for the construction of Active Sludge Roasting Furnace Shed and Electro Coagulation Treatment System at NFC, Hyderabad. TENDER NOTICE NO.: C/1438/2026
DEPOSIT-Fire and Rescue DG Office-Pantry Renovation -General Civil Work
Civil Works
Constructions of ramps for handicapped employees in permanent and temporary office building at Nangal Township.
Structural steel work in angles, tees, flats, riveted, including cutting, fixing all gusset plates, bolts, nuts, rivets etc. with hoisting and erecting in position. For roof truss, well curbs, plate girders etc. of any span for building for bridges upto 15M span CSR 18.3 (a)(CSR Item No. - 18.3 (a))
Jal Jeevan Mission (JJM)-Jal Jeevan Mission 2021-24-Phase II -WSS to Varavoor Panchayath Construction of 9.4LL OHSR-General Civil Work
.I pipes and specials, including testing of joints:200 mm diameter pipeì100.31.1.10:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 450mm diameter, Class I.ë100.31.1.7:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 300mm diameter, Class I.ë100.31.1.5:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 200mm diameter, Class I.3.Construction of Valve Chamber|OD98737/2023-2024:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift from 1.5 m to 3 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m -Ordinary Rockå4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)@13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand).4. Construction of Compound wall at OHSR site.OD261506/2022-2023:Dry Rubble Masonry with Hardstone in foundation and superstructre including cost of materials and Labour charges7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc completee13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointingÙ13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work5.Construction of Sheet pileO100.6.1:Providing steel sheet shoring to the sides of the trenches to depths of above 4.00 m but not exceeding 6.00m using 6 mm M.S. sheet 0.50 M wide stiffen on edges with 50 mm x 50mm x 6 mm M.S. angles driving down vertically on either side one after another in lines and levels with suitable pile driving equipments and accessories to a maximum depth of 0.50 M below the bottom of the proposed excavation 0.5 M above ground level suitably braced by horizontal walling pieces at 75 x 150 mm x 8 mm angles on either side at intervals not exceeding 1.50M and horizontal screw jack type struts at 1.50M intervals and maintaining the shoring till the pipes are laid and works are completed, dismantling, cleaning and restacking for reuse including all labour, hire charges and conveyance for equipments, tools and plants and sundries etc. complete.