Loading…
Loading…
8,009 results • Best match
Civil Work
Providing and laying M30 grade controlled cement concrete pavements including mixing and vibrations concrete with necessary needle vibrators and surface with screed board vibrating complete in all respect with 20/25 mm stone aggregate (crusher broken) including anti-skid textured finish to required camber/ super elevation and grade including curing etc. as per specification with cement concrete M-30 grade including cost of Steel frame work for sides of C.C. pavement consisting of M. S. channels flats and angles with required steel pegs ( some of them may left embedded in concrete/ including providing frame work)
Civil work for Construction of 33 KV Rasulabad Link bay at 132 KV S/S Rasulabad, Kanpur Dehat.
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (Code no. 10.2)
Appointment of Empanelment for Project Management Consultant (PMC) for Road Work, Water Supply Related Projects, Drainage Related Projects and Sanitation Related Projects, Renovation and Repairing projects of Civil Engineering Works of Deesa Nagarpalika Dist. Banaskantha
Construction
KIIFB-Restoration Work-Kottarakara Ring Road- Pipe laying work from Perumkulam jn to Kulakkada Panchayath Boundary-General Civil Work
MLA-SDF-2025-26 Construction of Post Office - Kunnathupadi road-in ward - 07 Vakathanam GP-General Civil Work
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
MLA-SDF-2025-26 Construction of Manalepparambu Puthupparambu road- in W-3 Vakathanam G P-General Civil Work
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)