Loading…
Loading…
4,798 results • Best match
Civil works including earth filling and construction of depot buildings, workshop, inspection shed, plumbing, drainage, external development, architectural finishes, road works , design and construction of PEB works of Delhi Metro Phase - IV.
Contract-D2C-08 - "Civil works including earth filling and construction of depot buildings, workshop, Inspection shed, plumbing, drainage, external development, architectural finishes, road works, design and construction of PEB works at Sanoth Depot of Rithala-Kundli Corridor of Delhi Metro Phase - IV."
Flood restoration and reconstruction of Sports Complex at Nillandrusu by way of drainage system with dewatering station Lawn Tennis Court, pickle Ball Court, 7A Side by Synthetic Football Field and seating arrangement.
Drainage Demolishing cement concrete manually /mechanically incl disposal of material within 50 metres lead as per direction of engineer incharge in 1:3:6
PROVIDING, SUPPLYING, AND LAYING OF WATER LINE AND DRAINAGE LINE, AND CONSTRUCTION WORK OF PRECAST PARAPET WALL AT MASUMDADA VADI-2, BHAGAVATI NAGAR-1, PRABHAT NAGAR-1, SCHOOL NO. 9, NEAR MAGANBHAI PUTLA-2, BARPARA-3, COMPOSED-2, UNDER THE MLA GRANT FOR THE YEAR 2023-24.(8th attempt)
Excavation for pipe line trenches for water supply, sewerage line,
Construction Of Underground Humepipe drain for Strome water and Drainage System at Different Streets Samarth /nagar, Kavi Nagar, Guddu Tomar Wali gali Etc. ward No. 19. Zone 08 File No. 202/26X3/6.
2.23Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift.
Reconstruction of Drainage at Temple Front to Hindupur Road (200'Length) 101 to 200' in the premises of Sri Math Khadri Lakshmi Narasimha Swamy Devasthanam at Kadiri (T) & (M), Sri Satya Sai District
Filling with carted coarse sand in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental ,labour charges,hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work(APSS NO.309&310)
Reconstruction of Drainage at Temple Front to Hindupur Road (200'Length) 0 to 100' in the premises of Sri Math Khadri Lakshmi Narasimha Swamy Devasthanam at Kadiri (T) & (M), Sri Satya Sai District
Filling with carted coarse sand in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental ,labour charges,hire charges of T&P etc., and overheads & contractors profit complete for finished item of work(APSS NO.309&310)