Loading…
Loading…
4,802 results • Best match
Partial silt clearance between Budhha Park to Bager Khal within Kalyani Municipal area, in order to prevent water logging problem and management of vector borne diseases and to ensure smooth drainage of water.
Earthwork in re-excavation / silt clearance in drainage channel in all kinds of soil including sludge, slush mixed with all sorts of industrial wastes and municipal garbages, polypacks, carcasses, small khatal effluents, night soil etc. by mathor labour as may be necessary and depositing the same in places as directed by the Engineer-in-charge , in such a manner, without causing much hindrance to traffic and posing health hazard and making arrangement to maintain the site in workable condition and rough dressing when dry including making arrangement of bailing out of any seepage water and removal of sand or soil blown from underneath, removal of khatal, temporary latrines, clearing and removing all kinds of semi compact masses formed by water hyacinth, jungles up to 30 cm girth, and burning them to ashes or removing outside Government land in conformity with the Municipal rules, including shoring shuttering as required, nicking out lines etc. (Measurement : Pre-work and Post-work level section. Pre- work section to be taken after removal of water hyacinth and all other floating materials etc.) (b) By mechanical means within an initial lead of 30 M and an initial lift of 1.50 M
Construction of cross drainage C.D. work at RD 18720 M on doab main canal and canal escape work at RD 3300 M on tail minor of doab canal under Sindh project phase II.
Construction of cross drainage C.D. work at RD 18720 M on doab main canal and canal escape work at RD 3300 M on tail minor of doab canal under Sindh project phase II.
Providing and Laying of balance storm drainage scheme on 200 feet wide PR-4 road from UT Chandigarh Boundary to Jayanti Ki Rao, New Chandigarh Area, SAS Nagar including maintenance of 05 years.
Providing and Laying of balance storm drainage scheme on 200 feet wide PR-4 road from UT Chandigarh Boundary to Jayanti Ki Rao, New Chandigarh Area, SAS Nagar including maintenance of 05 years.
Maintenance and Cleaning Drainage Spout, Uprooting stumps, root and other allied works at different bridges, culverts, Roads during the mansoon period at Cooch behar Highway Subdivision- I under the Cooch Behar Highway Division.
Labour for clearance of bridge drainage spout. Unskilled Labour [a.Majdoor (male/Female)]
Construction of drainage channel from Haripur SSK towards house of Nepal Mondal via Kamala Store at Mouza_Mashinapur, JlNo_51, Plotno_942 under Kotulpur GP within Kotulpur Panchayat Samiti out of 15th FC Fund.(A.C._117827895)
Construction of drainage channel from Haripur SSK towards house of Nepal Mondal via Kamala Store at Mouza_Mashinapur, JlNo_51, Plotno_942 under Kotulpur GP within Kotulpur Panchayat Samiti out of 15th FC Fund.(A.C._117827895)
Desilting and Cleaning of Master Sewer Lines of dia. 700mm, 800mm, 900mm, 1400mm,1600mm and 1800mm in Greater Faridabad sector-78 to 89 along with Operation and maintenance for 2.5 years and all other works contingent thereto.
HSR Items- Master Sewerage Scheme Faridabad- Desilting and Cleaning of Master Sewer Lines of dia. 700mm, 800mm, 900mm, 1400mm,1600mm and 1800mm in Greater Faridabad sector-78 to 89 along with Operation and maintenance for 5 years and all other works contingent thereto.