Loading…
Loading…
4,802 results • Best match
Providing, laying, jointing and commissioning of rising main 600mm dia. from IPS Panchayat Bhawan to existing master sewer line of mirzapur STP and from IPS Sector-9 to existing master sewer line of mirzapur STP complete in all respect including Re
HSR Items- Master Sewerage Scheme Faridabad- Providing, laying, jointing and commissioning of rising main 600mm dia. from IPS Panchayat Bhawan to existing master sewer line of mirzapur STP and from IPS Sector-9 to existing master sewer line of mirzapur STP complete in all respect including Renovation and Retrofitting of pump chambers on IPS sector 9, Anaj Mandi Ballabgarh and laying of interlocking paver blocks on pathway in disposal sector 9, 13, 14 and 18 Faridabad and all other work contingent thereto.
CONSTRUCTION OF 04 NOS. HIG, 14 NOS. MIG & 25 NOS. LIG HOUSES, 41 NOS. EWS HOUSES INCLUDING EXTERNAL DEVELOPMENT WORK (RCC ROAD, RCC CULVERT, WATER SUPPLY,SUMP WELL,PUMP HOUSE, SEPTIC TANK,WATER SUPPLY, SEWERAGE LING, LOW LAYING AREA ,RAMP ,GARDEN ) UNDER GENERAL SCHEME AT DEORIKHURD PHASE-III, BILASPUR (C.G.)
Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per clause-404.)
To lay a drainage line from Kushwaha Nagar Sector A, Lane No. 01, 02, 03 to Lane No. 04 main road and in all four adjoining lanes under Zone No. 4, Ward No. 17.
To lay a drainage line from Kushwaha Nagar Sector A Lane No. 01 02 03 to Lane No. 04 main road and in all four adjoining lanes under Zone No. 4 Ward No. 17.
Ward No. 21, Rameshwarpuri (Babhangaon) Construction of an interlocking road and drainage system extending from the Gandhinagar Main Road passing by the houses of Prince and Om Prakash Srivastava up to Rajan Srivastavas house.
Ward No. 21, Rameshwarpuri (Babhangaon) Construction of an interlocking road and drainage system extending from the Gandhinagar Main Road passing by the houses of Prince and Om Prakash Srivastava up to Rajan Srivastavas house.
Ward No. 15, Pikauradatturay (Dariya Khan) Construction of an interlocking road and drainage system extending from the Mosque up to Anwar Jamals house additionally, road repair work in front of the Darul Uloom gate.
Ward No. 15, Pikauradatturay (Dariya Khan) Construction of an interlocking road and drainage system extending from the Mosque up to Anwar Jamals house additionally, road repair work in front of the Darul Uloom gate.
Water Supply and Drainage work including construction and installation of water filtration system on 2nd Floor, PVC pipes at Existing State Seed Testing Lab Malda under Malda Arsenic Area Water Supply Division, P.H.E Dte.
Water Supply and Drainage work including construction and installation of water filtration system on 2nd Floor, PVC pipes at Existing State Seed Testing Lab Malda under Malda Arsenic Area Water Supply Division, P.H.E Dte.