Loading…
Loading…
4,995 results • Best match
Repairing & Renovation of Gujarat Juhu At Andheri Mumbai (Providing Granite Shelves Beds Wooden Doors to Shelevs and Miscellaneous Work)
drainage & water supply connection and minor correction to perform experienced in Lab shall be done by contractor at his
BOQ
Supply, installation, Curbing and marking of FIBA approved synthetic modular suspended interlocking Sports Flooring (Tile) with specifications as:- weight not less than 320gm/Sft, thickness not less than 1.50 cm, UV resistant antiskid surface made of Polypropylene (PP), double layered structure / Mesh with side locks, minimum temperature bearing capacity -40°C to 70°C, stay for 24 hours, Ball rebound performance ≥ 90%, slip resistance 80s-110, vertical deformation :1.5mm-5mm & the Product shall be listed on official FIBA website. The product should be Modular Flooring with application of game lines and transition materials. The items should be inclusive of drainage, adjustment of poles, curbing of edges / corners etc. complete marking of game line with game line paint as per FIBA inclusive of all leads, lifts, GST and carriages etc complete in all respect
Renovation of Cement Concrete Road at Ward No13 Sivasakthi Nagar street and Arasu Nagar IInd Street (East to west) in Palanichettipatti Town Panchayat .
Centering for soffits of reinforced cement concrete slabs or plain surfaces including strutting upto 6 mts height using MS sheets of size 90 cm x 60 cm (10 gauge) and stiffered with elded silver oak joists of size 10 cm x 6.5 cm spaced at about 90 ce c/c and supported by casurinaprops of size 10 cm to 13 cm dia spaced at 75 cm c/c complying with standard specification Drainage
Demolition and Complete Removal of Existing Overhead Service Reservoir (OHT) near Karuna Montessori School, Ward No. 20, under Municipal Corporation Panipat. For L and C Society.
Demolition and complete removal of existing overhead service reservoir located near Karuna Montessori School including all associated structures, foundations, and appurtenances. The work shall be executed with proper safety measures and precautions as specified herein. Scope of Work The scope includes but is not limited to the following: Preparatory Works: • Site mobilization and establishment of work zone barricading • Conducting structural stability assessment before commencement of demolition Safety Arrangements: • Erection of scaffolding, working platforms, and staging as required for safe demolition operations at various levels • Installation of safety nets, catch platforms, and debris chutes • Provision of personal protective equipment (PPE) for all workers including safety helmets, harnesses, safety shoes, and dust masks • Deployment of trained safety supervisors and implementation of safety protocols • Erection of warning signages, caution boards, and hazard indicators around the work area • Provision of first aid facilities and emergency response arrangements Utility Disconnections: • Safe disconnection and capping of all water supply lines, inlet and outlet pipelines • Disconnection of electrical connections, if any, by authorized electricians • Plugging or sealing of drainage connections • Coordination with utility departments for permanent disconnection Dust Suppression Measures: • Continuous water sprinkling during demolition activities to suppress dust generation • Provision of mist spray systems at demolition points • Covering of debris with tarpaulin sheets during non-working hours • Use of appropriate demolition techniques to minimize dust pollution Demolition Operations: • Systematic dismantling of overhead reservoir structure starting from top to bottom • Removal of roof slab, walls, columns, beams, and foundation in controlled manner • Breaking of RCC/masonry using appropriate tools and machinery • Careful demolition ensuring no damage to adjoining roads, drains, boundary walls, trees, or existing utilities Debris Handling and Disposal: • Collection, segregation, and loading of all demolition debris including concrete, masonry, steel, and other materials • Transportation of debris to approved disposal sites or contractor`s premises • Complete clearing of site leaving it clean and level • Backfilling of foundation excavations with approved material and compaction Site Restoration: • Removal of all scaffolding, platforms, and temporary structures • Cleaning of adjoining areas from spillage or debris • Repair of any inadvertent minor damages to roads or drains • Leveling and dressing of site as directed by Engineer-in-charge Material Ownership All materials obtained from demolition including but not limited to concrete rubble, bricks, stone, sand, steel reinforcement, structural steel, fixtures, and any other salvageable or non-salvageable materials shall become the absolute property of the contractor. The contractor shall remove all such materials from site at his own cost and dispose of. No separate payment shall be made for such materials and the contractor shall quote rates accordingly considering the value of salvaged materials. Quality and Compliance • All work shall be executed strictly as per IS Codes, NBC provisions, and local municipal regulations • Work shall be carried out under constant supervision ensuring quality and safety standards • Contractor shall obtain all necessary permissions, NOCs, and clearances from competent authorities • Work shall be executed to the entire satisfaction of the Engineer-in-charge • Any deficiency or damage caused due to contractor`s negligence shall be rectified at contractor`s cost Note: The contractor shall visit the site, assess all conditions, quantities, and difficulties involved before quoting rates. No claim for extra payment shall be entertained on account of unforeseen conditions or difficulties.
6.construction of drain and interlock road Upgradation of the previously constructed CC road from Rajkumar Singhs house to Pinku Singhs house in Mo. Sunasir Nath
Cleaning of drainage up to silt at site with disposal of 60mtr. including waste making diversion etc....all comp.
CEMENT NALA BANDH AT ANSING TAL. WASHIM DIST. WASHIM
Item No.8: providing and fixing anchor bar of 25mm diameter 3.375m length with resin bond cement capsule anchorage through adit itself including drilling holes, inserting grout capule, dirving anchor, cost of all materials, machinery, labour, ventilation, lighting, drainage and other anciliary operations etc co,plete with all lifts as directed