Loading…
Loading…
5,096 results • Best match
Develop.of 6L UER2 NH 344 M NH1 Km0.700 to Dwarka Sec24 Road Km38.111 in Delhi n 4L RS NH344 N NH344 M Delhi at Km26.135 of NH344 M UERII till BHD byp of NH10 near BHD in HR pkgI 2 3 NH344M n 5 NH344N 2 call Works at RnC of EPC Contractor
19 Drainage Spouts complete as per drawing and Technical specification Nos. 3821 Rate as per approved COS
ADDN ALTN OF REMNANT STORE MICROBIOLOGY LAB STORE ROOM AND ASSOCIATED WORKS AT FOOD INSPECTION ORG FIO QMG BR IHQ OF MOD ARMY AT KWC TIMARPUR AND OTHER SANCTION WORK UNDER GE NORTH DELHI CANTT10
S&F factory made uPVC white colour Three track three panels sliding window with fly proof S.S wire mesh (Two nos. glazed & one no. wire mesh panels) or openable type/casement windows upto 1.50m height made of (big series) frame 116 x 45 mm & sash 46 x 62 mm both having wall thickness of 2.3 ± 0.2 mm and single glazing bead/double glazing bead of appropriate dimension comprising of uPVC multi chambered frame, with inbuilt roller track and sash extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), appropriate dimension of uPVC extruded glazing beads and uPVC extruded interlocks, EPDM gasket, wool pile, zinc alloy (white powder coated) touch locks with hook, zinc alloy body with single nylon rollers (weight bearing capacity to be 40 kg), G.I fasteners 100 x 8 mm size for fixing frame to finished wall and necessary stainless steel screws etc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealent over backer rod of required size and of approved quality, including Glass & Wiremesh complete all as specified and directed by Engineer-in-Charge. Note: For uPVC frame and sash extruded profiles minus 5% tolerance in dimension i.e. in depth & width of profile shall be acceptable. Variation in profile dimension in higher side shall be accepted but no extra payment on this account shall be made.
CONSTRUCTION OF FIRE STATION BUILDING OF 2 UNIT FIRE STATION AT DUMROA IN THE DISTRICT OF BUXAR - WITH ELECTRIFICATION
Providing and fixing factory made uPVC white colour sliding glazed window upto 1.50 m in height dimension comprising of uPVC multichambered frame with in-built roller track and sash extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), appropriate dimension of uPVC extruded glazing beads and uPVC extruded interlocks, EPDM gasket, wool pile, zinc alloy (white powder coated) touch locks with hook, zinc alloy body with single nylon rollers (weight bearing capacity to be 40 kg), G.I fasteners 100 x 8 mm size for fixing frame to finished wall and necessary stainless steel screws etc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, including drilling of holes for fixing hardware's and drainage of water etc.
CONSTRUCTION OF FIRE STATION BUILDING (G+3) OF 02 UNIT FIRE STATION AT PIRO IN THE DISTRICT OF BHOJPUR WITH ELECTRIFICATION
Providing and fixing factory made uPVC white colour sliding glazed window upto 1.50 m in height dimension comprising of uPVC multichambered frame with in-built roller track and sash extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), appropriate dimension of uPVC extruded glazing beads and uPVC extruded interlocks, EPDM gasket, wool pile, zinc alloy (white powder coated) touch locks with hook, zinc alloy body with single nylon rollers (weight bearing capacity to be 40 kg), G.I fasteners 100 x 8 mm size for fixing frame to finished wall and necessary stainless steel screws etc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, including drilling of holes for fixing hardware's and drainage of water etc.
Repairing of Sump Room and Maintenance Office at Seva Sadan - 2, Valsad, Ta. Dist: Valsad
drainage & water supply connection and minor correction to perform experienced in Lab shall be done by contractor at his
Repairing & Renovation of Collector Office Building at Valsad (False Ceiling Work Flooring Work Door Window Repairing and Miscellaneous Work) Ta. Dist: Valsad
drainage & water supply connection and minor correction to perform experienced in Lab shall be done by contractor at his