Loading…
Loading…
4,868 results • Best match
CONSTRUCTION OF JAROUD TO SONBARSA BODTARA ROAD LENGTH 3.50 K.M. I/C CULVERT, AT DIST. BALODABAZAR-BHATAPARA( BALODABAZAR DN.).
Granular Sub-base as per Table:- 400-1 Construction of granular sub-base by providing graded Material, , carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface watering, rolling and compacting with vibratory power roller at OMC to achieve the desired density, complete as per clause 401 For Sub-base cum drainage layer or upper sub-base with Grading-V Material
Balance estimate included BC for 2.70km construction of R/W with Concrete DR masonry construction of drain, Irish drain roads safety items etc Provision for shifting utilities lump sum amount for unforeseen items are not included in this estimate.
CROSS DRAINAGE WORKS
REPAIR/MAINT OF INTERNAL ROADS, FOOTPATH, ROAD FURNITURE, WALKWAYS, ROAD, SIGNAGES, HARD STANDING, KERB STONE ETC AT MISA CAMP UNDER GE (S) TEZPUR
M&L for providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required and taking down of old broken kerb stone complete all as specified and as directed.
Construction of Drain from 0.00 K.m to 0.171 K.m at Dhabalagiri Main Road to Sobara Village for the year 2026-27
Providing & fixing drainage spout in deck slab of CD works as per approved drawing and technical specifications as per Section 2705 of MoRT&H Specifications for Road & Bridge works (Latest Revision)
(RETENDER) Proj no 409/26, Compound wall construction, interlock pavement and painting in Santhinilayam Anganwadi, Ward 19, Manjoor GP
OD507490/2025-2026:Designing, fabricating, testing, installing and fixing in position Curtain Wall with Aluminium Composite Panel Cladding, with open grooves for linear as well as curvilinear portions of the building , for all heights and all levels etc. including: a) Structural analysis & design and preparation of shop drawings for pressure equalisation or rain screen principle as required, proper drainage of water to make it watertight including checking of all the structural and functional design. b) Providing, fabricating and supplying and fixing panels of aluminium composite panel cladding in pan shape in metalic colour of approved shades made out of 3mm thick aluminium composite panel material consisting of 3mm thick FR grade mineral core sandwiched between two Alumini um sheets (each0.5mm thick). The aluminium composite panel cladding sheet shall be coil coated, with Kynar 500based PVDF / Lumiflon based fluoropolymer resin coating of approved colour and shade on face # 1 and polymer (Service) coating on face # 2 as specified using stainless steel screws, nuts, bolts, washers, cleats, weather silicone sealant, backer rods etc. c) The fastening brackets of Aluminium alloy 6005 T5 / MS with Hot Dip Galvanised with serrations and serrated washers to arrest the wind load movement, fasteners, SS 316 Pins and anchor bolts of approved make in SS 316, Nylon separators to prevent bi-metallic contacts all complete required to perform as per specification and drawing The item includes cost of all material & labour component, the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working curtain wall with aluminium composite panel cladding, cleaning and protection of the curtain wall with aluminium composite panel cladding till the handing over of the building for occupation. Base frame work for ACP cladding is payable under the relevant aluminium item.s The Contractor shall provide curtain wall with aluminium composite panel cladding, having all the performance characteristics all complete , as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer-in-Charge. However, for the purpose of payment, only the actual area on the external face of the curtain wall with Aluminum Composite Panel Cladding (including width of groove) shall be measured in sqm. up to two decimal places.
Construction / Upgradation of Rural Roads under Pradhan Mantri Gram Sadak Yojna including maintenance for Five Year after construction-PMJANMAN
Setting out work completed with construction of reference benchmark/working benchmark (minimum 5per Km ), made of concrete M-10 of size 575x575x450mm with a base of size 900x900x100mm including white washing, marking of chainage, Levels etc.(As per drawing Annex-I) and reference pillars made of cut stone having minimun thickness 65 mm / precast concrete poles/concrete (M-10) filled AC pipes @ 100 m interval embaded in concrete base of M-10 of size 300x300x750mm on both sides of the formation width, marking on centre line setting out curves and recording of central line levels and other required levels and distances etc. including setting out of Cross Drainage structures with required reference pillers and marking etc. as directed by Engineer-in-Charge. The setting out work will be maintaind by the contractor till the completion of work.