Loading…
Loading…
4,868 results • Best match
CWE/CHM-23/2026-27 SPECIAL REPAIR TO ROOF TREATMENT OF SHRI NAGESH OFFICER MESS AT CHANDIMANDIR MIL STATION UNDER GE CHANDIMANDIR
... required) shall be also fusion welded including drilling of holes for fixing hardware's and drainage of water etc., After fixing frame the gap between frame and adjacent finished wall shall be filled ...
Construction of Multi-storeyed Quarters Type-IV (28 units) & Ty-V (21 units) including Electrical and Telecom work at Civil Lines Nagpur.
... Vitrified tiles in floor in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, ...
Creation of infrastructure of Tactical Head Quarter (THQ) at the camp of 11th Bn ITBP situated at an altitude of10400 feet and a distance of 33 Km from Chungthang, Distt. Mangan, North Sikkim. Camp connected by road
... jointed duly sealed at all comers, including drilling of holes for fixing hardware and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled ...
SPL REPAIR TO BLDG NO ESO-51 UNDER AGE B/R-I OF GE SAUGOR
... and fusion welded at all corners, including drilling of holes for fixing hardware and drainage of water etc., making arrangement for fixing of hardware.EPDM gasket, 1.2+ -0.2mm thick galvanised ...
PROVISION OF CERTAIN MINOR WORKS IN DRDL, QRSAM AND DMRL UDNDER GE (I) RND KANCHANBAGH
... jointed duly sealed at all corners, including drilling of holes for fixing hardware and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled ...
GENERAL-ITDP Attappady-Construction of Dormitory at Model Residential School, Attappady, Palakkad District-General Civil Work
... required) shall be also fusion welded including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled ...