Loading…
Loading…
4,850 results • Best match
Diversion of Flood water from Maski nala to Kanakanala Valley near Aryabhogapura Village, Kustagi Taluk, Koppal District and Modernization of Kanakanala Project.
Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification Complete with all lead and lift as directed by Engineer incharge.
REPAIR TO JOINERY TILING SUNKEN SLAB CHAJJA ROOF PROJECTION FLOORING PLASTERING AND MISC CONNECTED WORK ETC OUTSIDE DEPOT AREA AT A A BANAR UNDER GE BANAR
S&F in repair sinks with drainage board made of stainless steel 1mm thick kitchen or laboratory with plugs, washers and wastes; including bedding in cement mortar to dwarf wall or including fixing cantilever brackets and connecting union to pipe overall size 915mm x 460mm bowl size 410mm x 330mm x 160mm including waste coupling and PVC waste pipe of suitable size as per site requirement complete all as specified.
Construction of RCC Bridge No. 1/1, River Taktara at Kumguri, Kashikota Kumguri village road.
Drainage Spouts complete as per drawing and Technical specification
Improvement of TATA Yard
... directed by Engineer in-charge including cutting & making up the cess and ensuring proper drainage slope and then re-inserting cleaned ballast into track and compaction of shoulder and ...
Construction of Spillway of Upper Lanth Irrigation Project, Belpada
Providing PVC water stop for drainage gallery as per approved design including fixing in proper alignment and joining with araldite etc. including cost of PVC water stop including positioning in proper place mobilization, demobilsation of men, materials and machineries including carriage,cess, & all other taxes complete as directed by Engineer-in-Charge.
Facelifting of CISF Barrack at DMP, Majhgawan, Panna
... jointed duly sealed at all corners, including drilling of holes for fixing hardware and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled ...