Loading…
Loading…
4,781 results • Best match
REDEVELOPMENT OF PECHARDAHAR WATERBODY
... and fusion welded at all corners, including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled ...
Provision of NGOs Transit Facility (NGO TF) at Varuna Complex, NPOL, Kochi
... jointed duly sealed at all corners,including drilling of holes for fixing hardware and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled ...
Construction of Additional Class Rooms and Toilet Repair Works at RA Bazar School, Lucknow Cantt
... jointed duly sealed at all corners, including drilling of holes for fixing hardware and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled ...
CA NO.CWE BLY/GE (W)/51 OF 2026- 2027SPECIAL REPAIRS TO BUILDING P-42 AND P-43 JCOS MD ACCN IBGH OUT UNDER GE (WEST) BAREILLY
S & PVC 110 mm dia soil , waste, vent or rainwater drainage pipes single socketed in any length with rubber ring joint laid in floor or fixed on wall all as specified or as directed.
COMPREHENSIVE REPAIR and MAINT OF DIV HQ, DIV CAMP , CMP UNIT AND OFFR MESS UNDER GE (NORTH) BINNAGURI
... and fusion welded at all corners, including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled ...
GES/PKT/34/2026-27 CERTAIN B/R AND E/M REPAIR/ REPLACEMENT WORK IN OTM ACCN OLD MR LOCATION UNDER GE SOUTH PATHANKOT
S&F, 110mm bore, PVC rainwater (SWR) drainage pipes single socketed, in any length with rubber ring joints as in repair, fixed to walls with sufficient number of Iron stack clamp complete all as specified and directed.