Loading…
Loading…
40,010 results • Best match
ANNUAL MAINTENANCE OF STORM WATER DRAINAGE SYSTEM IN SECTOR-14P-II HISAR (2025-26) (II)
Repair and maintenance of storm water drainage at various place in sector-14 ward 25 div 4B Under MCG. Recall
Repair and maintenance of storm water drainage at various place in sector-14 ward 25 div 4B Under MCG
Annual Maintenance of Storm Water Drainage System in Sectors 24 to 57, Gurugram for Monsoon Season 2026, including Deployment of Manpower, Hiring of Machinery, Repair and Maintenance of Drains, and all other works contingent thereto
... person per 2 km for upkeep of drainage network in a length of 85 ...
De-silting/cleaning of sewer lines and storm water drainage lines at various location in Phase-VI, Udyog Vihar, Guurugram.
De-silting/cleaning of sewer lines and storm water drainage lines at various location in Phase-VI, Udyog Vihar, Guurugram.
Providing of infrastructure facilities like roads, water supply, sewerage, Storm water drainage and street lights in balance area of RandR Pockets in sector-53, Phase-V at Industrial Estate Kundli.
Providing Storm Water Drainage along Dividing road of Sector 23 25 toward Sector 25 Urban Estate Ambala City Construction of RCC box drain for storm water drainage complete in all respect and all other works contingent thereto
Annual maintenance estimate for Storm Water Drainage in Sector 25, Rohtak for the year 2025-26.
Annual maintenance estimate for Storm Water Drainage in Sector-6, Rohtak for the year 2025-26.
Providing Storm Water Drainage With Cove Slab at ward no.20 Kumarakovil Street in Padmanabhapuram Municipality.
Annual Maintenance estimate for Storm Water Drainage in Sector 6 Rohtak for the year 2026-27
Annual Maintenance estimate for Storm Water Drainage in OLD ITI Rohtak for the year 2026-27
Annual Maintenance estimate for Storm Water Drainage in Sector 6 Rohtak for the year 2026-27
Annual maintenance estimate for Storm Water Drainage in Old ITI, Rohtak for the year 2025-26.
Annual maintenance estimate for Storm Water Drainage in Sector-6, Rohtak for the year 2025-26.
Annual maintenance estimate for Storm Water Drainage in Sector-6, Rohtak for the year 2025-26.
Annual Maintenance estimate for Storm Water Drainage in Sector 25 Rohtak for the year 2026-27
Annual maintenance estimate for Storm Water Drainage in Sector 25, Rohtak for the year 2025-26.
Annual Maintenance estimate for Storm Water Drainage in OLD ITI Rohtak for the year 2026-27
Annual Maintenance estimate for Storm Water Drainage in Sector 25 Rohtak for the year 2026-27
Annual Maintenance estimate for Storm Water Drainage in Sector 6 Rohtak for the year 2026-27
Construction of storm water drainage and culvert at Unnamalaikadai VAO office - Mudiyamparai in Unnamalaikadai Town Panchayat.
Annual Maintenance estimate for Storm Water Drainage in Sector 25 Rohtak for the year 2026-27
Construction of Storm Water Drainage System for Anna Nagar Kannadimill ward No 25 in Attur Municipality
CONSTRUCTION OF FIELD CHANNEL INSIDE NORTHERN NALLAH NEAR RMP-2 FOR IMMEDIATE DRAINAGE OF STORM WATER
Construction of Interlocking Khurra with Safety Wall for Storm Water Drainage from Hawasingh House towards the Main Road, Mahlana Utrada
... Khurra with Safety Wall for Storm Water Drainage from Hawasingh House towards ...
Urgent Disaster Management works including pre-monsoon maintenance of road infrastructure and storm water drainage system in Mapusa constituency
... road infrastructure and storm water drainage system in Mapusa constituency ...
Urgent Disaster Management works including pre-monsoon maintenance of road inftastructure and Storm water drainage system in Mandrem Constituency
... road inftastructure and Storm water drainage system in Mandrem Constituency ...
Urgent Disaster Manage works including pre monsoon maintenance of road infrastructure and storm water drainage system in Siolim Constituency.
... road infrastructure and storm water drainage system in Siolim Constituency. ...
Urgent Disaster Management works including pre-monsoon maintenance of road infrastructure and storm water drainage system in Porvorim constituency
... road infrastructure and storm water drainage system in Porvorim constituency ...
Formation of Industrial Layout, Including Construction of Flexible Pavement Roads, RCC Side Drains, RCC Chambers, RCC Storm Water Drains, RCC Cross Drainages, Laying of HDPE Pipes for Water Supply Works etc., at proposed Chintamani Industrial Area, Phase-I, Chikkaballapura District
... Drains, RCC Chambers, RCC Storm Water Drains, RCC Cross Drainages, Laying of HDPE Pipes for ...
ANNUAL MAINTENANCE ESTIMATE FOR STORM WATER DRAINAGE SCHEME IN SECTOR 14P-II AND SECTOR 33P HISAR (2026-2027)
... pumping set non clog for sewerage having head 15.00 m as per ...
Annual maintenance estimate of Roads, Water Supply, Seweraage and Storm water drainage Scheme in Sector-19, Rewari for the year 2026-2027
... machine for clearing of sewerage line including cartage, ...
Providing New Drainage Facility for Storm Water in Market Yard, Madanapalle of A.M.C, Madanapalle in Annamayya District
Annual Maintenance Estimate for Storm Water Drainage in Sector-4(Extn.), Rohtak for the year 2025-26.
Construction of storm water drainage culverts for new NSDF area along with soil filling at BARCF, Kalpakkam
Construction of Storm Water Drainage and Culvert at Ward 13 Sanjay Gandhi Street in Palanichettipatti Town Panchayat .
PROVN OF STORM WATER DRAIN FROM EXISTING DRAINAGE LINE BEHIND KLP, 1 TTR TO EXISTING DRAINAGE LINE NEAR A GATE, 1 MTR UNDER GE (WEST) JABALPUR
Desiliting of Storm water drainage Providing Cover Slab at WCR Simoncolony in Simoncolony Village Panchayat in Kurunthencode Panchayat Union
Desilting of Storm water drainage & Providing cover slab at WCR Simoncolony in Simoncolony Village Panchayat of Kurunthencode panchayat Union
ANNUAL MAINTENANCE ESTIMATE FOR STORM WATER DRAINAGE SCHEME IN SECTOR 14P-II AND 33P HISAR (2026-27)
Details project report for GIS based Storm Water Master Drainage plan for Sitarganj city in District U.S.Nagar
... for fixing hardware's and drainage of water etc. After fixing ...
Rough cost estimate for Construction of road, providing water supply, sewerage and storm water drainage system in front of Plot no. 363P to 368P, 36P-38P and 576-586 in sector-19 Rewari
Thanjavur District Orathanadu Town Panchayat G.F. 2025-26 Construction of Storm water Drainage at Sakkaraikulam East Channal
Re-construction of drainage/storm water system and other allied work adjoining the reservoir of the Clear Water Pump House at Chandrawal Water Works-II.
Re-construction of drainage/storm water system and other allied work adjoining the reservoir of the Clear Water Pump House at Chandrawal Water Works-II.
Nagercoil Corporation Maintenance of Storm water drainage and raising work at Ammankovil street and Arasu Colony road, ward no.5
Maintenance of Storm water drainage and raising work
Construction of internal roads, providing internal water supply, sewerage and storm water drainage scheme in the area of Mukhya Mantri Awas Yojna Site, Sector - 13 and 14-part, U/E, Gohana, District - Sonipat
Cleaning of existing road gullies and allied structures for Storm Water Drainage in the area under the jurisdiction of SDE Sewerage Sub Division No. 1 Chandigarh at Sector 16,17,22,23,24,10 (Part) Chandigarh for 3 months (Ch. to 2215 (NP) Urban Water
... and allied structures for Storm Water Drainage in the area under the jurisdiction of SDE Sewerage Sub Division No. 1, Chandigarh ...
Construction of Surface storm Drainage Channel at Zanodem for Conveyance of Storm Water and Protection of the Pipeline Access Road from chainage 3245m to 3349m.
... Construction of Surface storm Drainage Channel at Zanodem for Conveyance ...
Construction of storm water Masonry and RCC drain.........different wards under Kanchrapara Municipality for betterment of drainage system
Up gradation of internal service road with CC Road along with storm water drainage system at FSD Banderdewa.
Construction of Storm Water Drainage at Kariya perumal kovil east car street north portion in ward No 27