Loading…
Loading…
29,350 results • Best match
Construction of Storm water drainage at bright avenue street in ward No 87, South Zone
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum
UP-GRADATION AND STRENGTHENING OF INFRASTRUCTURE (SEWERAGE) INTERNAL AND EXTERNAL STORM WATER DRAINAGE, CONSTRUCTION OF ROADS, ELECTRIFICATION AND 15 MLD CETP INDUSTRIAL SECTOR-21and26, BHIWANI (REVISED)
Providing storm water drainage in low lying/ flood prone area of Ambala Sadar Town at Various locations
Supplying, erection, testing and commissioning of submersible motor pumping set non clog for sewerage having head 20.00 mtr as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked including all accessories (like SS Pipes, SS Chain (Shackle Chain) ,SS Foundation Bolt, complete base frame, Monorail, Chain Guide Line, Auto Compiling, Duct Foot Bend (D/F Bend) etc. complete in all respect. Discharge Capacity (LPM) - 24000 Power Capacity (BHP) – 160
CONSTRUCTION OF STORM WATER DRAINAGE PUMPING STATON WITHIN THE CAMPUS OF PALMER BRIDGE PUMPING STATION
Providing Storm Water Drainage arrangements in Government Medical College Hospital at Thiruvarur in Thiruvarur District
Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Construction of Storm Water Drainage at Saminathan Nagar 3rd Main Road (087008R085) Ward No.8
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum