Loading…
Loading…
10,860 results • Best match
COMPLETION OF INCOMPLETE WORK OF AUGMENTATION OF GEARING AND SHAFTING FACILITIES AT NSRY, SRI VIJAYA PURAM.
M&L for sand cushioning with dry and clean fine river sand for underground cable 8 cm before laying cable and 15 cm after laying and punned to 18 cm after laying of cable complete all as specified and directed. Note:- Punned thickness shall be considered for payment purpose.
81258/E8 COMPLETION OF INCOMPLETE WORK OF AUGMENTATION OF GEARING AND SHAFTING FACILITIES AT NSRY, SRI VIJAYA PURAM
M&L for sand cushioning with dry and clean fine river sand for underground cable 8 cm before laying cable and 15 cm after laying and punned to 18 cm after laying of cable complete all as specified and directed. Note:- Punned thickness shall be considered for payment purpose.
SITC of Addressable Fire Fighter Telephone System at ICMARD Building
Interconnecting Fire Survival Cable (As per NBC 2016 Part 4) in 'FR' PVC Rigid Conduit through saddles on wall, ceiling, cable duct of the building including Supply & Laying of Cable and Conduit as specified under Sl. No. 4 of Annexure - I (Scope of Work) of the NIT
Building Work
... Marble, height is 8ft and outer diameter of pond is 20ft, along with necessary R.C.C work with water proofing and tilling complete flooring with slab as per drawing design and... base). The width of pond wall should approx.1ft, depth of pond 2ft with all complete civil work and following features provision. a) RECIRCULATION PUMP: - 1. No. of Pump : 1 no. 2. ...
CONSTRUCTION OF TECH BUILDINGS ALONGWITH ALLIED INFRASTRUCTURE AT SHESHARTHANG UNDER GE I P NO 2 LEH
Total amount of Sch ‘A’ Part - IV (INTERNAL ELECTRIFICATION SUPPLY))
Rajkot Division-Signalling work in connection with Engg work of (i)TTR(TWS+WCMSC) 21 sets (ii)RJT-OKHA- CTR(P)-4.190 Tkm & TRR(P)-25.155Tkm (iii)JAM-KNLS Section: CTR(P) From Kms.848.886 to 850.700 Total 1.814 Kms (iv)Viramgam - Rajkot, Wankaner - Navlakhi & Surendranagar - Botad- CTR(P)- 4.013 Tkm, TRR(P)-8.982 Tkm and TSR(P)-50.74 Tkm(v) Kanalus: Rectification of bad layout from Pt 112 towards PBR side by shifting the turnout manually by 18m towards RJT.
Laying of S&T Cables of various cores/ pairs/ quads in trenches/ GI pipes/ RCC pipes/ DWC pipes/ Trunking. This also includes laying of cables in track crossings & road crossings. Item 16 includes provision of labels of coloured ...