Loading…
Loading…
11,273 results • Best match
PROVN OF SEWAGE LINE AT AF STN SIRSA
Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION WORKS" as listed in Schedule ‘A’ Part III
CWE/KAS-17/2026-27 PROVN OF CENTRAL RATION STORE AT 14 GTC SUBATHU UNDER GE KASAULI
... approved colour code multi stranded copper conductor, PVC insulated and unsheathed FRLSH cable conforming to IS-694 of size 1.5 Sqmm, 1100 volts grade, two run of single core cable for phase & neutral and one run of single core multi stranded copper conductor, PVC insulated ...
81484 SPECIAL REPAIRS TO SKYLARK MTS BUILDING NO P180 AT KATTABOMMAN UNDER GE TIRUNELVELI
Supply, laying & testing cable 95 Sqmm 3.5Core , XLPE insulated, screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty)with stranded aluminium conductor, 1100 volts grade including taking down old unserviceable cable complete all as directed by Engg-in-Charge.
SPL REPAIR FOR ROOF TREATMENT FOR LEAKAGE/SEEPAGE IN AFFECTED MD ACCN OF JHANSI STN AND SPL REPAIR OF PROJECTOR ROOM OF WTSI INSTITUE UNDER AGE BR-II AT GE JHANSI
Taking down old U/S earthing and M&L for Earthing complete with galvanised iron earth plate electrode 600mm x 600mm x 6 mm thick buried... plate not less than 1.5 mtrs below normal ground level connecting to GI wire 4 dia mm as earthing lead by means of bolts, nuts, check nuts and washers of galvanised iron or steel and ...
Work regarding the construction of a pumping station and the laying of a pipeline for the mechanical outlet system of the STP (Govindpuram) located in Pocket-F of the Madhuban-Bapudham Scheme.
Electrical Panel with Automation: Supply, installation, testing and commissioning of following Water supply Electrical control panel with VFD/Soft Starter ,suitable for 415 V, 3 phase, 4 wires, 50 Hz power... conforming to IP-42, compartmentalized design, fabricated out of 14 SWG sheet steel, painting, earthing numbering, danger plate as per specifications and drawings, flush front with Aluminium ...
Construction of Welcome Gate at Entrance of the State of Punjab
Supply, Installation, Testing and Commissioning of 800 mm long 11 W LED IP 65 Bollard , Housing made of extruded... accessories including preparation of finished CC foundation with suitable size HDPE pipe for cable entry and exit, electrical connections for incomming and outgoing cables etc complete as per requirement at site (The rate must include junction box/terminal ...