Loading…
Loading…
11,112 results • Best match
MOEI and Fans and electrical installation at President Estate Ashiyana Building Dehradun Subwork/Packages: Misc electrical work
Ancillary electrical works for Setting up of 50 Bedded Critical Care Hospital Block at Malda Medical College and Hospital, Malda. (Electrical Work)_SITC of Central Air Conditioning Plant. (Project ID_HF252635393S000)
SUB-HEAD 11--Supplying & Laying of Cable
Padrauna- Provision of Improvement & Augmentation of Power supply & electrical work connection to engineering misc. works related to Passenger Amenities.
conductor cable direct in ground including excavation, sand cushioning, protective covering and refilling the trench etc. as req. Cable laying work shall be governed by IS :1255/1983. (cable supplied by Railway).
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Laying of electrical cable in park; Electrical System or Installation; Service Provider
and Installation of Plant Systems/Equipments (Version 2) - Laying of electrical cable in park; Electrical System or Installation; Service Provider
GENERAL-Running Maintenance Contract for electrical installation in various Quarters under Pathanamthitta section for 2026-27-Running Maintenance Electrical Work
1.10.3:Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm. FRLS PVC insulated copper conductor single core cable etc as required.Group C
GENERAL-Running Maintenance contract for the Electrical installations in various offices at Vikas Bhavan building, Tvpm for the year 2026-2027-AMC El-General Electrical Work
1.10.3:Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm. FRLS PVC insulated copper conductor single core cable etc as required.Group C