Loading…
Loading…
10,147 results • Best match
1)Construction of New Office Building at RPF Outpost Hinganghat along with 05- bedded RPF Barrack under the jurisdiction of ADEN(Warora) Sub-Division in Nagpur Division in PH-64 in PWP 2025-26. 2)Construction of New Office Building at RPF Outpost Pulgaon along with a 05-bedded RPF Barrack under the jurisdiction of ADEN(Wardha) Sub-Division in Nagpur Division in PH-64.
Providing and Fixing Soap Dish Holder (ACN- Numbers 1131N) Total 813.45 Schedule 04-PART-(1)(d): Electrical work in connection with construction work of new office building
Supply, erection, commissioning and operation / maintenance for 05 years of 1.5 MLD Water Treatment Plant with Automatic Water Management System Integrated with Microprocessor-Based PLC Technology at Kathgodam in Izzatnagar division of N.E Railway on turnkey basis.
On completion of Civil and electrical works.
PROVN OF CENTRAL COOLING SYSTEM IN BLDG NO P-25 AT 25 WEU UNDER GE(EAST) LUCKNOW.
ELECTRICAL WORKS M & L for providing, laying, connection, testing and commissioning of complete electrical works for geothermal HVAC system including RCBO/MCB protection devices, copper power and control cables of suitable size, PVC conduits/cable trays/channels, cable terminations, glands, lugs, ...
Fabrication , Supply , installation , Testing and Commissioning of Internal and External signages system for New Sachivalaya Campus, Block No. - 1 To 7 , Swarnim Sankul - 1 & 2, Vidhan Shabha building, Sardar Bhavan, Gandhinagar.
disturbed finishes. All associated electrical works, FRLS cabling, junction boxes, earthing, control
Site survey, designing, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete ... complete works for ... Ground Cable Network ...
PRE BONDING TAP: For laying on trench after laying cable on trech to provide indication cable route below
Site survey, designing, engineering, procurement, supply, loading, transportation, unloading, insurance, delivery at site, handling, storage, installation, testing, commissioning including documentation of all items/material required to complete ... complete works for ... Ground Cable Network ...
PRE BONDING TAP: For laying on trench after laying cable on trech to provide indication cable route below