Loading…
Loading…
10,163 results • Best match
FOR CARRYING OUT THE VARIOUS LINE WORKS AND OTHER ASSOCIATED WORKS, DUE TO KANVAR YATRA, UNDER THE JURISDICTION OF EDD-PILKHUWA,
... Crossings and other locations as directed by the Engineer-in-Charge for public awareness and electrical safety. The work shall include preparation of artwork/design by the contractor incorporating electrical safety messages, statutory caution notices, hazard pictograms, departmental publicity/IEC ...
FOR CARRYING OUT THE VARIOUS LINE WORKS AND OTHER ASSOCIATED WORKS, DUE TO KANVAR YATRA, UNDER THE JURISDICTION OF EDD-HAPUR,
... Crossings and other locations as directed by the Engineer-in-Charge for public awareness and electrical safety. The work shall include preparation of artwork/design by the contractor incorporating electrical safety messages, statutory caution notices, hazard pictograms, departmental publicity/IEC ...
Remaining work Construction of Sub Health Center at Devliyari, Block Samdari, District Balotra. (Risk and Cost)
Providing & Laying P.V.C. / XLPE insulated & P.V.C. sheathed Un-armoured / Armoured aluminium cable of 1.1 KV grade as per PWD specification for electrical Works in existing RCC / Hume / Stoneware / PVC pipe/ open duct/cable trench with filling of excavated earth in trench , on existing cable trays or on surface ...
Appointment of Agency for Operation and Maintenance of Utility Tunnel, maintenance of firefighting pumps and its pipeline network with associated electrical system installed in Fire Station, MMR & GIFT House in DTA & SEZ area of GIFT CITY for five Years
Construction of Elevated Viaduct and Double Decker Station at Mathikere along with BSTP Viaduct ramp
Electrical Works
Vadodara Division: Provision of Passenger Escalators at 12.0-meter-wide FOB (including civil engineering works) at Bharuch Railway Station in connection with Amrit Station works.
The price shall cover for laying, testing and commissioning of LTUG armoured cable in Metre existing trench/pipe and its connection at both ends. The cable shall be tested with 500 Volt Megger earth tester before laying it in the trench. The cable cores shall be tested for continuity, absence of cross phasing, ...