Loading…
Loading…
9,817 results • Best match
UPGRADATION OF EXISTING TRANSFORMER FROM 250 KVA TO 400 KVA FOR CORPS ENGR SIGNAL REGT UNDER AGE E/M-II OF GE 865 EWS, LEH
Material and labour for Sand cushioning to under ground cables 8 cm below the cable before laying & 15 cm above the cable after laying, complete all as specified in clause 19.75 of SSR Part-I, 2009. Note : Punned thickness only will be measured and paid.
Manufacturing Supplying Installing Testing and Commissioning of Passenger lift 2 Nos at J1 and J2 Oshiwara Officers Quarters at Goregaon west
Electrical Works
MPLADS 2025-26 of Sri. Jose K Mani MP (RS)- Supply and Installation of solar street light at Muringoor Railway Bridge in Meloor Panchayat, Ward 15.
ELECTRICAL WORKS
UPGRADATION OF HT 11 KV TWO POLE STRUCTURE TO VCB AT AT SUB STATION NO 09 INCLUDING CONNECTED WORK UNDER GE DSSC WELINGTON
Supply and laying cable XLPE insulated screened, PVC bedded, galvanised steel strip or wire armoured, electric power cables (heavy duty) 11000 volts grade with stranded aluminium conductor of size 95 Sqmm 3 core including taking up or down existing unserviceable UG cable and removing from the site complete all as specified and directed. (Note: Excvation and earth work shall be measured and paid seperately)
Construction of Sewerage Treatment Plant STP and aprroach RCC drains under Liquid Waste Management LWM Used Water Management UWM for Swachh Bharat mission ward 1 and 10 at Tonkkhurd Dewas M.P. 8th Call
1. Design and build sewage treatment plant of installed capacity 0.85 MLD and all appurtenant structures and allied works; 2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer of about 200 m length including survey, design, construction ...
RE PLACING 11KV OH WITH COVERED CONDUCTOR FROMGALIGOPURA TO SWARGA UNDER ELECTRICAL SECTION,PERLA
Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing).