Loading…
Loading…
10,447 results • Best match
REPAIR MAINTENANCE OF HT CABLE, TRANSFORMER AND ALIED WPORKS AT KATIHAR MIL SN UNDER AGE (I) KATIHAR
Materials and labour for earthing complete with copper plate electrode 600 mm x 600 mm x 3.15 mm thick, burried directly... copper strip 20 X 3mm by means of nuts, bolts, check nuts and washers made of copper, earthing lead to be protected by galvanised iron pipe of 40 mm dia (medium grade) and other end connected to earthing test point or lightening arrestor or main controlling switch or as directed including ...
Redevelopment of Saima Lodge at Gandacherra
Providing and Installation of 3 HP (single/three phase) submerssible Pump (Electrical) as per relevent IS code with LT control panels connected with 100 mtr insulated cables from the distribution lines, 2 nos. electric pole of 8.5 mtr long 7/16 cable, well cap, housing clamp, column pipes, single/three ...
PROVN OF GUARD ROOM WITH TOILET FACILITY AND PERIMETER FENCING AT MAIN GATE OF 102 ENGR REGT UNDER GE BHOPAL
Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS as listed in Schedule ‘A’ Part-III (Ref prepriced schedule attached seperately)
CONSTRUCTION OF 100 BEDED GIRLS HOSTEL AND ACADEMIC BLOCK FOR KASTURBA GANDHI BALIKA VIDYALAYA AT WAZIRGANJ DISTRICT- BUDAUN (U.P)
Supply, installation, testing and commissioning of electrical panel, modular type, front accessible only, free floor standing confirming to Minimum... shrouded and provided with padlocking arrangement on all compartments including bus bar and cable alley chambers. The panel height shall not exceed 2200mm and the maximum operating height ...
CONSTRUCTION OF INTERGRATED ADMINISTRATIVE BUILDING FOR AMBAJI AREA DEVELOPMENT AND PILGRIMAGE TOURISM GOVERNANCE AUTHORITY, AMBAJI, GUJARAT
Subhead-5: Electrical Works
REPAIR/ REPLACEMENT OF LT CABLES, LT PANELS AND CONNECTED WORKS AT DOMESTIC AREA AT AF STATION JODHPUR
M&L for sand cushioning for XLPE cable with tibba sand (one layer of 80mm thickness before laying of cable and other layer of 150mm thickness after laying of cable) and punning down to 180mm thickness to provide a required cover complete all as specified and directed by the Engineer-in-Charge. Note:- Punned thickness shall only be measured and paid.