Loading…
Loading…
10,605 results • Best match
CA NO CWE/AMB/SOUTH-98 OF 2025-26 PROVN OF PROPER DRAINAGE SYSTEM TO AVOID INUNDATION IN KLP OF HQ RECURITING ZONE AMBALA CANTT UNDER GE (SOUTH) AMBALA CANTT
Material and labour for earthing complete with galvanised steel earth plate electrode of size 600X600X6 mm thick buried... reinforced with 8 mm dia TMT bars @ 80 mm c/c boath ways including excavation and earth work and removal of surplus soil to distance n exc 50 m complete all shown in electrical plate No 3 of SSR part- 2010 complete all as specified and directed. Note:- Note : 1. ...
Proposed Improvements to Perani (PEI) Ballast Depot in ADEN /CGL Subdivision- Electrical arrangements thereof
formation levels).duly removing stone ballast, back filling of the excavated cable trench(after laying of cable with HDPE pipe),ramming & consolidation properly and providing back the removed stone ballasts complete in a manner as directed by Section Engineer incharge at site. Above/
Supply Installation Testing and Commissioning of Public Information Display Screens (LED) for Real Time Status Traffic Advisory and Char Dham Yatra Information System at Maa Bhadrakali Temple and Maletha Distt Tehri Garhwal
10 Feet Customized MS Pole with paint and Mounting ( Uni/ Dipole depending on site availability) - Civil Foundation Work (as per Load and Design from OEM) -SPD , 01 No Earthing with strip for structural, 01 No earthing with strip for Equipments) AS per IS-3043-2018.
The work for maintenance and repair of L.T Line, 11 K.V. Line and 33 K.V. Line (Pole replacement, repairing of S.T.P. etc.) to ensure uninterrupted supply in the area of UEDD-Machhodari, Varanasi
... properly welding the angles around pole to give robust structure. After completing of above work grouting and muffing of pole 300 mm above ground level with cement, concrete, sand and... Store to site & Damage pole from site to store (excluding PCC Pole) and other necessary work with material eg. earthing of pole, Shackle Insulator, Holding Clamp, Nut & Bolts of different Size Cross Arm.
CONSTRUCTION WORK OF 132 KV LILO LINE FROM EXISTING 132 KV SC SAWAI Madhupur - UNIARA LINE TO 132 KV GSS SOP
Earthing a) Earthing of towers with pipe type earthing excluding the supply of Pipes, wires, flates & connectors, but including coke / charcoal, etc. excavation, augering, and backfilling in all types of soil.
LT Line Standardisation work at Adoor School Area under elelctrical section Mulleriya
Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing).