Loading…
Loading…
10,645 results • Best match
SITC of Low Capacity 3 kW Wind Turbine Generator in ON Grid and Hybrid mode with storage mode at designated location in STD Sopore under Capex Budget 2025-26.
Supply, Transportation (including loading & unloading), Installation, Testing & Commisioning of Earthing by Chemical Earthing Electrodes. (1 set = 4 nos.)
RENOVATION OF HOUSE NO. 829, (TYPE-13) IN SECTOR-7, CHANDIGARH. (E.I. WORK). (IBM NO. W4/2026/26011)
DSR item No.1.8 Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with piano type switch, phenolic laminated sheet, suitable size M.S. box and earthing the point with 1.5 sq.mm.FRLS PVC insulated copper conductor single core cable etc. as required.
Construction of 400 KLD STP at PMAY 480 nos houses Jahirpur Kurshi Road Lucknow under infrastructure work
STP- Construction, Supply, Installation, testing and commissioning of 400 KLD STP based on Constructed Wetland Technology including ...
Repairing of Tube well at JJ Cluster Holambi AC 01
Installation of all E&M Equipments, lowering pump set into the bore all piping work fixing of valves and accessories executing minor civil works, making electrical connections with cable as required size by the help chain pulley to lower pump sets testing and commissioning ...
SPECIAL REPAIR/REPLACEMENT OF 100 KVA DG SET AT PH NO 07 AGAINST BER AT AFSSR UNDER GE (AF) GURGAON
M&L for Earthing complete with & including galvanised steel earth plate electrode of size 60 cm x 60 cm... aggregate and 40mm thick RCC (1:2:4 type B1) cover complete all as specified and shown in electrical plate No 3 of SSR Part-I including necessary excavation and earthwork in any type of soil, returning, filling in approved soil and disposal of surplus soil ...
CERTAIN REPAIR/ REPLACEMENT OF U/S SECURITY/ STREET LIGHTS, MCCB,S AND MISC WORKS AT DALHOUSIE CANTT
Sand cushioning with fine sand to under ground cables in trenches/ducts in layers of 8 cm deep before laying the cable and 15 cm deep after laying and stretching the cable as specified in clause 19.75 of SSR Part-I, complete all as specified and directed by Engr-in-Charge.