Loading…
Loading…
10,645 results • Best match
S/F of 27 Nos. 7.00 mtr. Long pole SP-3 along with 10X2 armoured cable, LED fitting, Single arm bracket, Swithes etc. at Neelgiri to Allahabad Bank Ward-69, Zone-06, Kanpur.
Supply and burying of 40mm dia x 4.5mtr long G.I. pipe vertically for earthing having 12mm dia. Holes spaced 75mm apart drilled up to 2 mtr. form the bottom complete with earthing lead of no. 6 to 8 SWG G.I. wire in GI pipe up to apron (and from apron to switch board ...
Dewatering From Gallery of Akodra Dam Of Dewas II Project Tehsil Jhadol District Udaipur DMFT Fund
... change over switch, front handle operated, four pole 415 V as per PWD specification for electrical Works conforming to IS/lEC 60947-3 : 1999 including connections , testing etc. as required... pre approved by Engineer in charge. For additional technical parameters of products/ work , refer Annexure "A" attached with this BSR . Open execution type 125 A
S&T works for Augmentation of Water Supply Arrangement by construction of sedimentation tank at Adityapur station.
Alterations/modifications works on existing Numbers relay rack (Q- series/ Composite Relay Racks)/Cable Termination Racks (CTR) including works of installation, wiring, termination, testing and commissioning. The work includes fixing of aluminium/steel/M. S ladder along w ith supply a s per requirement ...
Erection & Maintenance of HT,LT & TC under Vanthali Sub Division for Linkline Scheme Work
Cable/Conductor length. Cable length must be measured before laying. Cable
Erection & Maintenance of HT,LT & TC under Vanthali Sub Division for Maintenance Scheme Work
Cable/Conductor length. Cable length must be measured before laying. Cable
Erection & Maintenance of HT,LT & TC under Mendarada-1 Sub Division for Maintenance Scheme Work
Cable/Conductor length. Cable length must be measured before laying. Cable