Loading…
Loading…
10,643 results • Best match
Bilathikulam shopping complex - Toilet Maintenance works, KSHB Office complex, Kozhikode -Maintenance work, KSHB Office complex - Gate and Compound wall Maintenance works
ELECTRICAL WORKS
Work of Supply and replacement of various types of damaged A and B Panel installed under the area of Executive Engineer,1st 11 KV LT Network, Kalyanpur KESCo. Kanpur
Digging of trench by Making pits after due survey with the help of utility detector of existing electrical/telephonic cable/and other utilites of public utilites department and laying of cables of size 3.5 CX70/3.5 CX120/3.5 CX240 Sq mm. XLPE by manual drill (by making moles) ( (As Above Clouman B-1,B-2,B-3 & B-4 mentioned cable are laid in this technology)
EDR/10 OF 2026-27, DATED 29-06-2026
Earthing of Sub-station ,excavation of earth pit of dia 650mm and depth 3000mm,installation of earthing pipe of 40mm nominal bore and 4mm wall thickness and length 2.5 mtr.long as per IS 1239.GI strip for neutrl earthing of size 25 mm*3 mm for connection of transformer body ,G.O set and lightening arrestor ...
Setting up of quick watering arrangement system at Amanwadi station -Electrical Arrangements.
Cutting of esphated road/ concrete/ cement/under the track etc., and excavation of 69 cable trench 30 cm wide x 90cm deep road etc., for laying of HT/LT UG cable. After laying of cable the trench should be brought to its original position by providing tar/ concrete/ cement as per the site conditions and as per directions of Rly. Engineer.
REPAIR OF DAMAGED AND UNSV SUBMAIN WIRING, TUBE LIGHT FITTING, SWITCH SOCKET ETC AT MH NAMKUM AND UNSV LT PANELS DAMAGED INSULATOR AT NAMKUM AND KHOJATOLI UNDER GE RANCHI
M & L for Sand cushioning trenches using fine sand to under ground cable, laid in two layers 15cm before laying the cable & 8cm after laying the cable complete all as specified and directed.
GE (N) P/TOKEN- 14 OF 2026-2027 SPL REPAIR TO BLDG NO 01 AT ARJUN MARG UNDER AGE B/R (CENTRAL) OF GE (NORTH) PUNE
... Copper insulated Busbar assembly for each phase, isolated Neutral bar, 2 Earthbar and Cable ties for cable management, IP 43 - #IK 09 with metal door including necessary cement work and electrical connections complete all as specified and as directed.