Loading…
Loading…
10,882 results • Best match
OHE Modification work in connection with increasing CSR of Line No 7,8,9 at Rajkot station of Rajkot division.
Supply of Earthing stations as per technical specifications
Term contract for repair/replacement of internal wiring for certain OTM Accns, Cook houses, toilet blocks, Class rooms, Officers/JCOs/OR Md Accn at ARTC S Shokhuvi (Nagaland)
Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FR PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with piano type switch, phenolic laminated sheet, suitable size GI box and earthing the point with 1.5 sq.mm. FRLS PVC insulated copper conductor single core cable etc as required
REPAIR MAINTENANCE SERVICING OF STAND BY DIESEL ENGINE DRIVEN GENERATING SETS AND ITS CONNECTED MISC ITEMS LOCATED OTHER THAN MH, WAR CENTER AND FILTRATION PLANT AT ARMY AREA JODHPUR AS PER CPP SER NO 34
M&L for laying, jointing, testing cable XLPE insulated, armoured and PVC sheathed LT 1100 volts grade and aluminum conductor confirming to IS 7098 laid in trenches/through pipe/floor/fixed wall etc complete all as specified and directed for size of cables 95 Sqmm 3.5 core stranded conductor including taking down old unserviceable cable as directed by Engr-in-Charge
REPAIR PREVENTIVE MAINT OF HT 11 KV VCBs RMUs AND CSS WITH ALLIED WORK UNDER GE (AF) JAMNAGAR NO 01
... Interlock between Earth switch and off load isolator (xii) Interlock of earth switch and BKR cable door (xiii) ON load isolator operation of closing and opening by manual (xiv) ON load ...
Provision of 750V, 4000A, 3000kW Substation Rectifier system for testing of Kolkata Metro coaches.
Earthing arrangement for DC power source as per ICF Specification. 3481000.0
ADDN/ALTERATION TO BLDG NO P-1 (LIFTS) OF MH JRC UNDER GE (EAST) JALANDHAR CANTT.
Material and labour for earthing in replacement complete with galvanized steel earth plate electrode 600 x 600 x 6mm thick... elbow etc shall be deemed to be included in the unit rate. (iv) If the testing result of earthing work is not been found satisfactory then the contractor shall do other earthing work at his own cost and nothing shall be permissible on this account. (v) Earthing work will ...