CONSTRUCTION OF CERTAIN TECHNICAL, ADMINISTRATIVE AND MARRIED / SINGLE LIVING ACCN WITH CONNECTED SERVICES AT AF STN DEESA UNDER PH-II (DESIGNATED AS GP-III)
Note:- (i) Earthing is to be done infront of the Engr-in-Charge. (ii) Test Results of earthing to be submitted by the contractor for all earthings. (iii) The Contractor shall have to give written guarantee for maintenance earth resistance ...
SPECIAL REPAIR TO BLDG No. P-1743 SINGLE ORs LIVING ACCN AT 412 HOSPITAL AT JAISALMER UNDER GE(A) JAISALMER
M&L for bore earthing not less than 250 mm dia 16 feet deep filled with black soil up to 7 feet from bottom... magnisium sulphate, charcoal & salt up to ground level connected to 4.00 mm dia GI wire as earthing lead up to 7.5 mtr by means of bolt and nut, check nuts and washer of galvanized iron or steel including brazing work and 40mm dia light grade pipe for earth lead protection connected to electrical equipment ...
please refer BOQ
Supplying, installation, Testing & Commissioning of LED Recessed/ surface Down lighter (Round/ square/ Rectangular)... Glare Rating) 19, Flicker free (flicker should be below 5%), life time (LED,Driver & electrical circuitary), of minimum 50000 Burning Hours with 70% of initial Lumen maintained till ...
SPL REPAIR TO BLDG NO P-50 ESH-1 AT FASF BHUJ UNDER GE (A) BHUJ
(iii) Earthing shall be tested as specified in casul 19.137 of SSP PART - I 2009 , to the entire satisfication of Engr-in-Charge. (iv) On teting after complataion of earthing , if the desired earth resistance is not obatined the earthing wiil be re done by the contractor at his on risk and cost to the entire satisfaction of the Engr - in - charge. (1 Each)
SHIFTING OF 66 KV HT LINE CROSSING OVER THE RESIDENTIAL HOUSES AT WARD NO. 16 UPPER SHIVA NAGAR, KATHUA under the jurisdiction of Sub-Transmission Division Kathua.
SITC OF Earthing complete by GI Rod 20 mm 2.5 mtr long through GI Strip
Construction of Additional Bay for Receiving Station Wanganpora
Supply,Installation, Testing and commissioning of 33kV Isolator without Earthing Blade (36kV,800A,Outdoor,3 poles,25kA.