Loading…
Loading…
10,810 results • Best match
REPAIR/REPLACEMENT OF SECURITY LIGHT,TIMER PANEL, SOLAR STREET LIGHT,STREET LIGHT POLES,FLOOD LIGHT,JUNCTION BOX,ACSR CONDUCTOR AND CONNECTED ALLIED SERVICES AT OUT POCKETS UNDER GE DINJAN NO.2
M & L Sand Cushioning (dry) in trenches/ducts for protection of UG Cables (below, above and around the UG Cable laid in Trenches) of 23 Cm Spread thickness (8 Cm in depth before laying the Cable and 15 Cm in depth after laying the Cable) and consolidated (punned) upto 180 mm thickness, complete all as specified ...
REPAIR/REPLACEMENT OF FLOOD LIGHT, LED STREET/SECURITY LIGHT, STREET LIGHT POLE, TIMER SWITCH, SOLAR LIGHT, STREET LIGHT JUNCTION BOXES AND ALLIED WORK WEST AREA UNDER GE (EAST) AGRA
M&L for local sand coushioning with dry and clean over and under the cable for protection of cable , 80 mm sand laid before laying the cable 150 mm sand after laying the cable and filling the sand in cable duct of inside the sub station building complete all as specified and as directed.
COMMUNITY DEVELOPMENT WORKS AT EKAGHARIA UNDER NTPC TTPP
Laying of power cable up to 35 sq mm
COMMUNITY DEVELOPMENT WORKS AT GURUJANG PANCHAYAT UNDER NTPC TALCHER TPP
Laying of power cable up to 35 sq mm
ENGINEERING PROCUREMENT AND CONSTRUCTION (EPC) FOR PROVISIONING OF BASIC STORAGE AND INFRASTRUCTURE FOR SPL VEH AND EQPT INCL GHE/GSE FOR NGMMCB DET 1 AT CAMPBELL BAY
Material & Labour for supply, installation, testing and commissioning of copper pipe electrode earthing maintenance free earthing based on 3 mtr long copper pipe 18mm dia (ID) with wall thickness of 2mm, copper strip ...
Design, Erection and Commissioning of 150 KLD capacity packaged STP based on SBR technology including 1 year defect liability period after 3 months trial run period and laying of sewer line
150 KLD (SAINIK SCHOOL KUNJPURA) - Designing, construction, Installation, commissioning of 150 KLD Sewage Treatment with peak factor 3.00 Based on MBR Technology ...