Loading…
Loading…
66,742 results • Best match
REPAIR MAINT OF AC ANY TYPE WATER COOLER DESERT COOLER REFRIGERATOR DEEP FREEZER INTERNAL ELECTRIFICATION ELECTRICAL FITTINGS AND FIXTURES AND MISC EM WORKS AT AF STN BAMRAULI UNDER GE AF BAMRAULI
... blower motor, cooling coil and checking the air circulation to ensure complete movement of working part trouble free. (c) Inspection of leakage in system and removal obstruction if any. (d) Inspecting all electrical connection and remove if any defects (e) Top up Refrigerent gas if required. Note: Replacement ...
Supplying, laying and installation of power cable and other misc. electrical item for high mast installed at left flank of bansagar dam distt. shahdol (M.P.)
eProcurement System Government of Madhya Pradesh Created By: Vivek Saraiya Created Date/Time: 30-Mar-2026 12:56 PM Tender Title: Supplying, laying and installation of power cable and other misc. electrical item for high mast installed at left flank of bansagar dam distt. shahdol (M.P.) Tender ID: 2025_WRD_466698_1
Construction of Maa Canteen with electrification works with necessary electrical appliances of MAA Canteen at Dakbunglow Campus, at Plot no.-832,Mouza-Dalkhola,JL no.- 20, Khatiyan no.-664/1,at Ward no-8
Earthing with 50 mm. dia. ISI make -Medium gauge G.I. pipe of 3.04 mts. Length x 3.64 mm. thick and 1 x 14 SWG G.I. Hot Dip wire ( 4 Mts long ) with necy. items for earthing works as per PWD. Schedule .[ PWD . P- G-1 / I – 2.a ]
Outsourcing of labour part of different electrical works for year 2026-27 under PSPCL Suburban Division Batala of Circle Gurdaspur.
... Lines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Releasing of T/Well Connections, GSC/ISC Connections, Deloading of Overloaded ...
Repair and Maintenance of Electrical Substation and Cabling Work at Govt. Women Polytechnic College Ajmer
P / L of Double wall corrugated HDPE pipe confirming to IS : 16205 P-24, Stiffness Class 750 N, Externally corrugated and having smooth surface inside with HDPE Coupler, Elbow, Tee at required Depth below the ground for laying cable of following Nominal Outer dia. MFR Test report from NABL accrediated is to be submitted.(Excavation of trench, CC Haunching, Back filling of Earth with compaction is to be Paid Extra).
Please refer BOQ
1.10.3:Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm. FRLS PVC insulated copper conductor single core cable etc as required.Group C