Loading…
Loading…
59,797 results • Best match
ELECTRICAL WORKS
Earthing of support with MS Earth Rod of (20x2500)mm. long including excavation of pit and driving MS Rod 3.0M apart from support and 0.5M below the ground level and connecting below the earth electrodes with the help of G.I. Wire No.6 SWG tightening with nuts and bolts.
Provision of 11KV HT Works and Strengthening of TNEB HT Demand to the newly constructed building for Bio Safety Lab (Level-III) facilities at King Institute of Preventive Medicine and Research Campus, Guindy, Chennai
6. TP ND IDMT 2OC + 1 EF Relay similar like Megawin type MCDG 31 Master trip Relay Megawin MVAJH 13 (Incom-1No & Out-1 No) 7. Breaker ON/OFF/Auto Trip/Healthy/Spring Charged Indication Lamp LED Type 8. Phase Indication Lamps R,Y,B(Incomings 3Nos) 9. Control Wiring 10. 800Amps Copper Bus bar PVC Sleeved and required panel copper earthing. 11. Control switch TNC (Incoming-1 No, Outgoing -1No) 12.Trip Circuit healthy Push Button(Incoming-1 No, Outgoing -1No) 13. Common for Switch gear, MCB's for AC DC Control, Heater ON/OFF Switch with space Heater and thermostat Single phase switch socket, cubicle illumination lamp, Disconnecting type terminal Block.etc., 14. MS Sheet enclosure for Indoor Installations Powder coated with Paint shade siemens Grey, paint finish Provision through Bottom entry to receive Incoming and Outgoing cable excluding cable glands and cable termination etc.(Make Megawin/System Control /Siemens).
GENERAL-Urgent special repair work to Sub court Koyilandy Electrification-General Electrical Work
Work Name:GENERAL-Urgent special repair work to Sub court Koyilandy, providing false ceiling to Judges Chamber at court complex Koyilandy,Kozhikode-Electrification-General Electrical Work
Installation of new false ceiling based LED luminaries, ceiling fan including thorough repairing of electrical wiring with allied electrical works for SAE/AE office room ofPBPS(Drg.)/S and D.
INSTALLATION OF NEW FALSE CEILLING BASED LED LUMINARIES, CEILING FAN INCLUDING THOROUGH REPAIRING OF ELECTRICAL WIRING WITH ALLIED ELECTRICAL WORKS FOR SAE/AE OFFICE ROOM OF PBPS(DRG.)/S&D.
IMPROVEMENT WORK OF LIGHTING SYSTEM ALONG WITH OTHER ELECTRICAL AND LIGHTING WORKS AT VARIOUS PLACES IN WARD NO.-45, UNDER BOROUGH- V
Renewal of External Lightings with post, bollard fittings cable arrangements and pillar boxes from Amphi theatre to Kamarajar Mandapam in Gandhi Mandapam Campus at Guindy in Chennai.
Renewal by Supply and fixing of 250 A Three phase 500V 4 Pole Change over Switch on suitable angle iron frame work with MS cable entry boxes with PWD Earthing.