Loading…
Loading…
59,746 results • Best match
Sub Work. Renewal of Stretcher cum Passenger Lifts in Medical Block and AOT Block and Special Repair works to Children Block Lift at Govt. Kasturiba Gandhi Hospital for Women and Children, Chennai-05
Earthing as Supply and insallation maintenance free GI Earthing System comprising of 50mm dia and 2 mtr. long earth electrode of low carbon steel rod with 100 micron bonding and 25 kgs. of carbon based environment friendly backfill compound and suitable clamp (M-1616)
Sub work. Provision of 1 No. 250 KVA Generator Set and Power mains arrangements to the OP Block at IMH, Kilapuk, Chennai-10
(19) 1No Signal lamp for indicating load on set (20) 1No Signal lamp for indicating set fails to start (21) 1No Signal lamp for indicating ‘Set running ’(22) 1No Signal lamp for indicating ‘Battery charger ON ’(23) 1Set Pilot lamps of 3Nos (24) MCCB of 500A capacity with magnetic thermal over lead release, instant start circuit trip and under voltage release switch .(25) Rectangular copper bus bars (1No for each phase, neutral and earthing terminal) of adequate capacity duty colour coded with head shrinkable PVC sleeves. (26) 1No Mains Voltage monitor (27) Hooter/Audio Alarm for indicating set fails to start and for DG O/L (28) 1 Set Timers
Conversion of HT structure into RMG and VCB at Arignar Anna Government Hospital of Indian Medicine Campus, Arumbakkam, Chennai-106
10. 630Amps Copper Bus bar PVC sleeved & required panel Earthing 11. Common for Switch gear MCB's for AC/DC Control Heater ON/OFF switch with space Heater and thermostat, single phases switch socket, cubicle illumination TL lamp, Door switch fully covered Test Terminal block of IMP make(wherever applicable) 12.MS Sheet steel Enclosure for outdoor Installations powder coated with siemens Grey paint finish. 13. Provision through bottom entry to receive Incommutable excluding cable glands and cable Termination Kit (Make: Megawin/Siemens/or Equivalent) (DATA-1)
LAC-ADS- 2024-25 Gov L P School Mukkattukara In Thrissur - Finishing works Phase 3 -LAC-ADS Construction of New Building for Govt L P School Mukkattukara inThrissur Constituency Finishing works -Phase 3-General Electrical Work-Electrification-
1.10.3:Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm. FRLS PVC insulated copper conductor single core cable etc as required.Group C
Part-I (Civil Work) Construction of building portion including water supply, sanitary installation, Septic tank r water harvesting system, Site development and approach road etcetera) Part-II (Electrical work) SITC, Electrical installation, Lift, ad
Supply, installation, testing and commissioning of fully automatic Oxygen Control Panel 2100 LPM (two thousand one hundred litres per minute) @ 50 to 55 PSI (fifty to fifty five pounds per square inch). The fully automatic control panel should comply with NFPA 99 / HTM 0201 / ISO 73961 NFPA (ninety nine /HTM zero two zero one / ISO seven three nine six one) standard. It shall be fully automatic, including shifting to secondary bank when the service bank is exhausted, with automatic reset of replaced bank to primary status. Semiautomatic manifolds are not acceptable. The manifold control(s) shall incorporate including designing and petty purchase to complete the job with five year (five year) on-site replacement warranty. All rates are inclusive of carriage of materials within all leads and lifts and all taxes of octroi, royalty, malkana, toll tax, sale tax, GST or other taxes as imposed by the Govt time to time where applicable. MAKE:- AKTIV / Raj Med / HSIPL / Becon Medeas / Greggorson / Amico / Penlon. a) Pressure transducer to actuate designated signals when service bank is exhausted. b) Visible display on control unit to determine when primary bank is exhausted, and the secondary bank is in operation. A continuously lit green indicator to indicate header in use. c) HMI touch Screen to indicate contents of each header. d) An amber indicator of header ready for the secondary header. A red indicator of header empty for each header. e) Display on HMI touch Screen for line pressure/Gas Flow in lpm/ FiO2 (FiO two). f)Manifold design shall ensure that the failure of any one component does not prevent continued supply of gas to patients. Manifolds design shall incorporate ed regulators for header switching and shall not require heaters for any gas. Alarm Manifold power supply shall be separate unit for ease of installation. Wiring between manifold and power supply shall be manufacturer supplied. Manifolds requiring electrical work inside the manifold cabinet during installation are not acceptable. Wiring shall terminate in power supply box not in manifold. Manifolds which can perform switching operations with electrical power are acceptable. The manifold panel should be compatible with Hospital BMS provides all relevant signals to be publish on Hospital BMS structure. Manifold Control Panel should have CDSCO license/ AMERICAN ETL/UL Listed or EU MDR/MDD certified from notified body having four digit notified number.
Electrical works
Earthing with G.I pipe 2.5mtr. Long and 40mm dia, including excavation, refilling with alternate layer of salt & Charcoal as per drawing & direction of Engineer In charge (excluding supply of G.I.Pipe, Salt & Charcoal, Gi wire, nuts &boIts, etc. as required)