Loading…
Loading…
59,797 results • Best match
Part-I (Civil Work) Construction of building portion including water supply, sanitary installation, Septic tank r water harvesting system, Site development and approach road etcetera) Part-II (Electrical work) SITC, Electrical installation, Lift, ad
Supply, installation, testing and commissioning of fully automatic Oxygen Control Panel 2100 LPM (two thousand one hundred litres per minute) @ 50 to 55 PSI (fifty to fifty five pounds per square inch). The fully automatic control panel should comply with NFPA 99 / HTM 0201 / ISO 73961 NFPA (ninety nine /HTM zero two zero one / ISO seven three nine six one) standard. It shall be fully automatic, including shifting to secondary bank when the service bank is exhausted, with automatic reset of replaced bank to primary status. Semiautomatic manifolds are not acceptable. The manifold control(s) shall incorporate including designing and petty purchase to complete the job with five year (five year) on-site replacement warranty. All rates are inclusive of carriage of materials within all leads and lifts and all taxes of octroi, royalty, malkana, toll tax, sale tax, GST or other taxes as imposed by the Govt time to time where applicable. MAKE:- AKTIV / Raj Med / HSIPL / Becon Medeas / Greggorson / Amico / Penlon. a) Pressure transducer to actuate designated signals when service bank is exhausted. b) Visible display on control unit to determine when primary bank is exhausted, and the secondary bank is in operation. A continuously lit green indicator to indicate header in use. c) HMI touch Screen to indicate contents of each header. d) An amber indicator of header ready for the secondary header. A red indicator of header empty for each header. e) Display on HMI touch Screen for line pressure/Gas Flow in lpm/ FiO2 (FiO two). f)Manifold design shall ensure that the failure of any one component does not prevent continued supply of gas to patients. Manifolds design shall incorporate ed regulators for header switching and shall not require heaters for any gas. Alarm Manifold power supply shall be separate unit for ease of installation. Wiring between manifold and power supply shall be manufacturer supplied. Manifolds requiring electrical work inside the manifold cabinet during installation are not acceptable. Wiring shall terminate in power supply box not in manifold. Manifolds which can perform switching operations with electrical power are acceptable. The manifold panel should be compatible with Hospital BMS provides all relevant signals to be publish on Hospital BMS structure. Manifold Control Panel should have CDSCO license/ AMERICAN ETL/UL Listed or EU MDR/MDD certified from notified body having four digit notified number.
Electrical works
Earthing with G.I pipe 2.5mtr. Long and 40mm dia, including excavation, refilling with alternate layer of salt & Charcoal as per drawing & direction of Engineer In charge (excluding supply of G.I.Pipe, Salt & Charcoal, Gi wire, nuts &boIts, etc. as required)
Providing Street Light arrangements to the Government Hospital for Thoracic Medicine at Tambaram Sanatorium in Chengalpattu District.
Earthing as per the ISI specification with an earth electrode of 2.10 metre Class 'B' GI pipe of dia not less than 40 mm with copper earth plate of size 125 mm x 50 mm x 6 mm with necessary funneling arrangements with necessary masonry work and with 38mm RCC cover slab for the brick masonry
Improvements by providing 2 Nos. 250 KVA Diesel Generator Set for NKM Building, Secretariat, Chennai-09
22. 1 Set Pilot lamps of 3 Nos 23. MCCB of 800A capacity with magnetic thermal over lead release, instant start circuit trip and under voltage release switch 24. Rectangular copper bus bars(1 No for each phase, neutral and earthing terminal) of adequate capacity duty color coded with heat shrinkable PVC sleeves. 25. 1 No Mains Voltage monitor 26. 1 Hooter/ Audio Alarm for D G O/L 27. 1 Set Timers 28. Audio and visual indication arrangements for a. Low Lubricating Oil pressure b. High water temperature c. Over speed 29. 1 No Earth fault relay 30. Isolator to Isolate the neutral NOTE: 1. The control panel should be complete with Necessary fuses , cables, labels, other accessories with Isolation 2. The engine should trip for the following conditions a. Low Lubricating Oil pressure b. High water temperature c. Over speed
ELECTRICAL WORKS
Laying of cable upto 3/4core x 25 sq. mm on wall / surface incl S & F MS saddles with earthing attachment in 10 SWG GI (hot dip) wire, making holes etc as necy. mending good damages and painting. F1, 2b + 3% District Charge.
ELECTRICAL WORKS