Loading…
Loading…
60,006 results • Best match
Installation of 7.5 Cusec Vertical Turbine Pumping Unit with allied Mechanical and Electrical works for Augmentation of LIS Kreshibal.
3 Providing and fitting of 70 sqmm XLPE insulated, 1100V single core armoured industrial copper cable as under (Preferred make: Finolex/ Gloster/ Havells/ KEI/ Polycab). The cable is required to be laid in Three lines from motor to Starter and starter to Voltage stabilizer and stabilizer to MCCB along with required size copper thimbles. Additionally three lines for ML 3 starters to motor alongwith thimbles 4 100 Mtr 0 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
INSTALLATION OF LED FITTINGS AND OTHER ELECTRICAL WORKS IN RAJA GOPI MOHAN STREET AND OTHER PLACES AT WD-27.
DEPOSIT-INSTALLATION OF 20 KVA DIESEL GENERATOR AT WOMEN PRISON AND CORRECTIONAL HOME,VIYYUR.-DG INSTALLATION-General Electrical Work
90.14.1.2:Fabrication, supply, conveyance, installation testing and commissioning of floor or wall mounting, dust and vermin proof, cubicle type MV panel board comprising of the following components/ devices & complying to IS 8623. Fabrication of fully partitioned, dust and vermin proof enclosure for panel assembly as per form 4 of IS 8623 (with latest amendments) using CRCA sheet as per approved design and requirement, with front and rear access facility, bus bar chambers, hinged doors for all switch gear compartments, earthing the doors using 4 sq mm braided copper conductor, providing necessary cut-outs for mounting meters, relays, indication lamps, bus bar interconnection etc, detachable covers for bus bar chamber and cable alley, powder coating the assembly after subjecting to 7 tank process etc as required. CRCA sheet alone be used for the fabrication. Angles/ flats/ slotted angles etc shall not be used for the fabrication of panel assembly. The measurments will be taken the area of the complete sheets used for panel board including partitions, folding, shrouding etc.Supply and fabrication of MV panel board using 1.6mm CRCA sheet, powder coated (excluding base frame)
Annual mtc. of complete electrical installation works incl. main sub stations, main and emergency buildings, CCU, all operation theatres, Natun Bhavan bldg, subdivision office and allied areas of hospital complex under BSMCH Electrical Section II
Electrical Installation maintence manpower charges for day to day (preventive , corrective and breakdown ) & replacement of materials ( supplied by Dept ) at the time of demand from Authority concern / officers at site within the following areas . The maintence & replacement of materials with Lamp , Holder , Choke , Fl. Tube , LED Lamp , HPSV Choke , Condenser , Ignitor , Fan Condenser, wires etc should be 3 (three ) shifts per day on working & holiday including operation of HT and LT Electrical Installation and arrangement for uninterupted power supply as when required to different Hospital utilities and operation of DG set with sub stations and for rutine preventive maintenance work and report recorded in the prescribed format by the Engineer -in-charge subject to terms , condition & scope of work . The agency have to depute folowing categories of personnel for day to day maintenance of EI work with the valid workman permit / license from the Director of Electricity , West Bengal , and all of them should be provided with self explanatory photo Identity cardsas per direction of EIC Area Coverd : i) Main Sub Station, ii) Blood Bank, Surgery OT, Causality OT, CCU, USG Room, Orthopaedic OT , ENT OT, Male Medical Ward, Female Medical Ward, Male Chest Ward, Female Chest Ward , Covid-19 ward , MSVP office etc including allied areas of Main & Emergency Building iii) Haematology Lab , Microbiology Lab, Covid-19 Testing Lab , Pharmacology Lab, Pathology Lab, Anatomy (Organ) Museum , Central Library , 350 Lecture Hall etc of Natun Bhavan Building iv) Sub Division office ,with various Quarters & street light etc.
Construction of Balance Works For Jigaon Lift Irrigation Scheme No 2 StageI and StageII including electrical work
Raising Height of Barvi Dam Rehabilitation Work Electrical related emergency repair works for monsoon 2025 -- 3rd Call