Loading…
Loading…
60,712 results • Best match
Civil Electrical Plumbing and Sanitary Works
APPENDIX B - ELECTRICAL WORKS
Renovation of the School of Chemistry Building and Chemistry Annex Building at HCU, Hyderabad. SH Wiring and Supply, installation, Testing and Commissioning of Panel & Enclosures, Light Fixtures, Ceiling Fans and Other Allied electrical works in ... Supply, installation , ... Allied Electrical works ... Electrical works in ...
1 Electrical Work 1155672 Above 23.2 1423787.904
Composite work of refurbishment of B-Block lecture hall related to Civil, Electrical, HVAC and other allied works at ground floor, Mod Labs, North Site, BARC, Trombay, Mumbai- 400085
Supply, installation, testing and commissioning of Cables, Earthing conductor and cable termination
(Part-1) C/O Building Portion, WS SI, Septic Tank, Rain Water Harvesting Tank, Site Development and approach road). (Part-II (Electrical Works) (SITC Electrical Installation, lifts, Addressable Fire Alarm, fire fighting system, MGPS system, Solar P
Supply installation Testing & commissioning of Fully Automatic Oxygen Control Panel2100LPM @ 50 to 55 PSI The fully automatic control panel should comply with NFPA99/HTM0201/ISO 73961 standard. It shall be fully automatic, including shifting to secondary bank when the service bank is exhausted, with automatic reset of replaced bank to primary status. Semiautomatic manifolds are not acceptable. The manifold control(s) shall incorporate: a) Pressure transducer to actuate designated signals when service bank is exhausted.b) Visible display on control unit to determine when primary bank is exhausted, and the secondary bank is in operation. A continuously lit green indicator to indicate header in use. c) HMI touch Screen to indicate contents of each header. d) An amber indicator of header ready for the secondary header. A red indicator of header empty for each header. e) Display on HMI touch Screen for line pressure/Gas Flow in lpm/ FiO2.Manifold design shall ensure that the failure of any one component does not prevent continued supply of gas to patients. Manifolds design shall incorporate ed regulators for header switching and shall not require heaters for any gas. Alarm Manifold power supply shall be separate unit for ease of installation. Wiring between manifold and power supply shall be manufacturer supplied. Manifolds requiring electrical work inside the manifold cabinet during installation are not acceptable. Wiring shall terminate in power supply box not in manifold. Manifolds which can perform switching operations with electrical power are acceptable. The manifold panel should be compatible with Hospital BMS provides all relevant signals to be publish on Hospital BMS structure. Manifold Control Panel should have CDSCO license/ AMERICAN ETL/UL Listed or EU MDR/MDD certified from notified body having four digit notified number. including Designing ,petty purchase to complete the job with five year replacement warrantyon site .all rates are inclusive of carriage of materials within all leads and lifts and all taxes of octroi ,royality, malkana, toll tax,sale tax Gst or other taxes as imposed by the Govt time to time where applicalble.Make:-AKTIV /Raj Med / HSIPL / Becon Medeas / Greggorson / Amico / Penlon
Undertaking electrical works in various parks of Pune Municipal Corporation, including repair of huts and other electrical improvement works at Chhatrapati Sambhajiraje Udyan Shivajinagar.
eProcurement System Government of Maharashtra Created By: vishal pathak Created Date/Time: 06-Feb-2026 05:56 PM Tender Title: Undertaking electrical works in various parks of Pune Municipal Corporation, including repair of huts and other electrical improvement works at Chhatrapati Sambhajiraje Udyan Shivajinagar. Tender ID: 2025_PMCP_1244189_1
LAC-ADS-Construction of Taluk hospital Konni Phase-2-General Electrical Work-Electrification of lift well
Work Name:LAC-ADS-Construction of Taluk hospital Konni Phase-2-work-General Electrical Work-1-Electrification of lift well