Loading…
Loading…
61,330 results • Best match
URGENT ELECTRICAL WORKS AT ROXY BUILDING UNDER KMC
Emergency Mechanical and Electrical Work at Takari LIS
Emergency Mechanical and Electrical Work at Takari LIS
Laying UG Cable From Nadukuriz To Onakkoor Paalam under Electrical Section Pampakuda,ELECTRICAL DIVISION MOOVATTUPUZHA
eTendering System Government of Kerala Created By: Suresh K C Created Date/Time: 29-Nov-2025 04:28 PM Tender Title: Laying UG Cable From Nadukuriz To Onakkoor Paalam Tender ID: 2025_KSEB_820735_1
PROVN OF EARTHING PITS LAYING OF POWER SUPPLY CABLE AND ADDN/ALTN TO LT INFRA INCLUDING PANELS AT AFS UNDER GE (AF) JORHAT
(o) Emc compliance- As Per 89/336/EEC Directive amended by 92/31/EEC. (p) System diagnostic port - RJ45 (q) Surge counter - 6 Digit, 7 Segment LCD counter (r) Status indication- LED Indications. (s) Operating temperature - 40 TO 80 degree C. (t) Weight- approx 1.8 KG. (u) Dimensions (wxhxd/mm)- 130x205x96. (v) Enclosure- Metal Enclosure (Pre-wired). (w) Paint - Pulverulent body painting (x) Desired ER value of the earthing must be less than 1 Ohm (y) Installation, commissioning & testing - Digital grounding device must have connected with 10 sq mm earthing wire with copper eyelet casing and caping of ISO standard company need to be used. 6 sqmm four core three phase fire retardant and low smoke wire will be used for input supply of digital grounding device. site survey for installation of equipment must be done by the seller and warranty for 2 years. Note : (a) The above rates are inclusive of disconnecting old earthing connected to the equipments. (b) The above rates are also inclusive of acessories such as nut bolts, wires, etc. for necessary connection of the digital earthing equipment.
Electrical work requirement at Various Locations in the Institute
Electrical Work requirement at Various Locations in the Institute.
MISCELLANEOUS ELECTRICAL WORKS IN ENERGY DEPARTMENT AT TNPL UNIT - II, TRICHY.
8337500402 Cable laying and Termination work: Laying of L.T. power and control cables including charges for laying, dressing and clamping of cables - in racks, trays, in concrete shafts/underground excluding excavation and back filling upto 2.5 sq mm